Completion of the Residual Water Drainage Subsystem of Mezio Alguidar (Q2982273): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 779,237.44 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
916,361.0 Euro
Amount916,361.0 Euro
UnitEuro
Property / budget: 916,361.0 Euro / rank
 
Normal rank
Property / EU contribution
 
779,237.0 Euro
Amount779,237.0 Euro
UnitEuro
Property / EU contribution: 779,237.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.04 percent
Amount85.04 percent
Unitpercent
Property / co-financing rate: 85.04 percent / rank
 
Normal rank

Revision as of 04:27, 22 October 2021

Project Q2982273 in Portugal
Language Label Description Also known as
English
Completion of the Residual Water Drainage Subsystem of Mezio Alguidar
Project Q2982273 in Portugal

    Statements

    0 references
    779,237.0 Euro
    0 references
    916,361.0 Euro
    0 references
    85.04 percent
    0 references
    10 August 2016
    0 references
    30 September 2020
    0 references
    MUNICÍPIO DE LOUSADA
    0 references
    Q3000056 (Deleted Item)
    0 references
    0 references

    41°16'38.57"N, 8°16'57.47"W
    0 references
    A presente operação contempla a instalação das redes em “baixa” necessárias para concluir o Subsistema do Mezio, bem como o estudo geológico e o levantamento topográfico necessários para o respetivo projeto. Prevê-se também a instalação dos Intercetores em “alta” que permitem fechar este subsistema. (Portuguese)
    0 references
    The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English)
    9 July 2021
    0 references
    Lousada
    0 references

    Identifiers

    POSEUR-03-2012-FC-000380
    0 references