Interventions at the Lands of Bouro (Daru) (Q2982193): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
(Removed claim: budget (P474): 1,150,640.32 euro) |
||||||
Property / budget | |||||||
| |||||||
Property / budget: 1,150,640.32 Euro / rank | |||||||
Revision as of 04:27, 22 October 2021
Project Q2982193 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Interventions at the Lands of Bouro (Daru) |
Project Q2982193 in Portugal |
Statements
23 March 2018
0 references
31 March 2021
0 references
ÁGUAS DO NORTE, S.A.
0 references
Q3006399 (Deleted Item)
0 references
Esta Operação visa a redução da poluição urbana na massa de água do rio Homem (HMWB Jusante B. Vilarinho Furnas), com especial enfoque no integral cumprimento da Diretiva 91/271/CEE de 21-05-1991, relativa ao Tratamento de Águas Residuais Urbanas (DARU) através da construção da ETAR de Terras de Bouro bem como, a instalação de uma estação elevatória e 4,43 Km de intercetor para efetuar a ligação aos sistemas em "baixa" existentes. (Portuguese)
0 references
This operation aims to reduce urban pollution in the mass of water in the Man River (HMWB Jusante B. Vilarinho Furnas), with a special focus on full compliance with Directive 91/271/EEC of 21-05-1991 on the Treatment of Urban Waste Water (Daru) through the construction of the Bouro Land treatment plant as well as the installation of a lift station and 4.43 Km interceptor to connect to existing systems at low level. (English)
9 July 2021
0 references
Terras de Bouro
0 references
Identifiers
POSEUR-03-2012-FC-000274
0 references