Construction of submarine cable for offshore energy reception in Viana Castle pilot zone (Q2981132): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 30,000,000.0 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
49,581,246.0 Euro
Amount49,581,246.0 Euro
UnitEuro
Property / budget: 49,581,246.0 Euro / rank
 
Normal rank
Property / EU contribution
 
30,000,000.0 Euro
Amount30,000,000.0 Euro
UnitEuro
Property / EU contribution: 30,000,000.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
60.51 percent
Amount60.51 percent
Unitpercent
Property / co-financing rate: 60.51 percent / rank
 
Normal rank

Revision as of 04:23, 22 October 2021

Project Q2981132 in Portugal
Language Label Description Also known as
English
Construction of submarine cable for offshore energy reception in Viana Castle pilot zone
Project Q2981132 in Portugal

    Statements

    0 references
    30,000,000.0 Euro
    0 references
    49,581,246.0 Euro
    0 references
    60.51 percent
    0 references
    1 August 2016
    0 references
    31 December 2020
    0 references
    REN - REDE ELÉCTRICA NACIONAL, S.A.
    0 references
    Q3055281 (Deleted Item)
    0 references
    0 references

    41°41'32.53"N, 8°50'18.13"W
    0 references
    A Operação consiste na construção de um cabo submarino e um posto de corte que permitirá a ligação à rede da Zona Piloto de Viana de Castelo, onde serão instalados projetos de produção de energia renovável offshore. A Zona Piloto irá localizar-se no mar a cerca de 17km de distância da costa e não possui, até à data, de qualquer ligação que permita introduzir a energia produzida na Zona Piloto na rede elétrica nacional. (Portuguese)
    0 references
    The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English)
    9 July 2021
    0 references
    Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
    0 references

    Identifiers

    POSEUR-01-1001-FC-000020
    0 references