Basic and Secondary School of Macedo of Knights – EB Rehabilitation 2.3/S (Q2899395): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 492,649.59 euro)
Property / budget
492,649.59 Euro
Amount492,649.59 Euro
UnitEuro
 
Property / budget: 492,649.59 Euro / rank
Normal rank
 

Revision as of 21:43, 21 October 2021

Project Q2899395 in Portugal
Language Label Description Also known as
English
Basic and Secondary School of Macedo of Knights – EB Rehabilitation 2.3/S
Project Q2899395 in Portugal

    Statements

    0 references
    1 July 2020
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE MACEDO DE CAVALEIROS
    0 references
    Q3000061 (Deleted Item)
    0 references

    41°32'27.38"N, 6°57'54.72"W
    0 references
    A intervenção proposta passa pela intervenção na generalidade do equipamento escolar, com destaque para a requalificação das coberturas e a substituição da totalidade das caixilharias exteriores, bem como a remodelação integral das redes de abastecimento de água e a requalificação parcial da rede de drenagem de águas residuais. (Portuguese)
    0 references
    The proposed intervention involves intervention in general school equipment, with emphasis on the requalification of the roofs and the replacement of all external boxes, as well as the integral remodeling of the water supply networks and the partial requalification of the sewage drainage network. (English)
    8 July 2021
    0 references
    Macedo de Cavaleiros, Macedo de Cavaleiros
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000213
    0 references