REHABILITATION OF THE PELOURINHO SQUARE (Q2895018): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 133,617.11 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
157,197.0 Euro
Amount157,197.0 Euro
UnitEuro
Property / budget: 157,197.0 Euro / rank
 
Normal rank
Property / EU contribution
 
133,617.0 Euro
Amount133,617.0 Euro
UnitEuro
Property / EU contribution: 133,617.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 20:49, 21 October 2021

Project Q2895018 in Portugal
Language Label Description Also known as
English
REHABILITATION OF THE PELOURINHO SQUARE
Project Q2895018 in Portugal

    Statements

    0 references
    133,617.0 Euro
    0 references
    157,197.0 Euro
    0 references
    85.0 percent
    0 references
    1 November 2016
    0 references
    30 June 2017
    0 references
    MUNICÍPIO DE PENEDONO
    0 references
    0 references

    40°58'23.02"N, 7°23'31.74"W
    0 references
    A zona a intervencionar situa-se em pleno centro urbano, encontrando-se a mesma degradada e desqualificada, isto é, sem as devidas condições para a conjugação entre recreio e animação do espaço urbano, com particular enfoque no património arquitetónico histórico. A regularização e integração paisagística de todo o espaço circundante ao Pelourinho, com o edificado existente, representa uma prioridade no processo de reabilitação. (Portuguese)
    0 references
    The area to be intervened is located in the middle of the urban centre, being the same degraded and disqualified, that is, without the necessary conditions for the combination of recreation and animation of urban space, with particular focus on the historical architectural heritage. The regularisation and landscape integration of the entire space surrounding Pelourinho, with the existing building, represents a priority in the rehabilitation process. (English)
    8 July 2021
    0 references
    Penedono, União das freguesias de Penedono e Granja
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000021
    0 references