ENERGY REHABILITATION OF THE POOL MUNICIPAL DE OLIVEIRA DE AZEMÉIS (Q2894499): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 104,172.25 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
241,398.0 Euro
Amount241,398.0 Euro
UnitEuro
Property / budget: 241,398.0 Euro / rank
 
Normal rank
Property / EU contribution
 
104,172.0 Euro
Amount104,172.0 Euro
UnitEuro
Property / EU contribution: 104,172.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
43.15 percent
Amount43.15 percent
Unitpercent
Property / co-financing rate: 43.15 percent / rank
 
Normal rank

Revision as of 20:42, 21 October 2021

Project Q2894499 in Portugal
Language Label Description Also known as
English
ENERGY REHABILITATION OF THE POOL MUNICIPAL DE OLIVEIRA DE AZEMÉIS
Project Q2894499 in Portugal

    Statements

    0 references
    104,172.0 Euro
    0 references
    241,398.0 Euro
    0 references
    43.15 percent
    0 references
    1 May 2018
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    Q3000779 (Deleted Item)
    0 references

    40°50'35.20"N, 8°28'6.67"W
    0 references
    Pretende-se reduzir consumos/custos de energia com vista a melhorar a classificação energética da Classe C para a Classe A através da implementação das seguintes medidas:-Aplicação de Sistema Fotovoltaico de Auto Produção -Substituição da Iluminação existente por LED’s -Aplicação de isolamento na cobertura da nave -Aplicação de cobertura do plano de água -Substituição dos grupos circuladores por equipamentos de alta eficiência de última geração. (Portuguese)
    0 references
    The aim is to reduce energy consumption/costs in order to improve the energy classification from Class C to Class A by implementing the following measures:-Application of Photovoltaic Self Production System -Replacement of existing LED Lighting -Insulation application in the ship’s cover -Application of coverage of the water plan -Replacement of circulating groups by state-of-the-art high-efficiency equipment. (English)
    8 July 2021
    0 references
    Oliveira de Azeméis, União das freguesias de Oliveira de Azeméis, Santiago de Riba-Ul, Ul, Macinhata da Seixa e Madail
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000056
    0 references