Implementation of sewage sewage networks connected to the Quinta de Cima sewage plant (Q2982399): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 526,083.56 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
618,922.0 Euro
Amount618,922.0 Euro
UnitEuro
Property / budget: 618,922.0 Euro / rank
 
Normal rank
Property / EU contribution
 
526,084.0 Euro
Amount526,084.0 Euro
UnitEuro
Property / EU contribution: 526,084.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 19:17, 21 October 2021

Project Q2982399 in Portugal
Language Label Description Also known as
English
Implementation of sewage sewage networks connected to the Quinta de Cima sewage plant
Project Q2982399 in Portugal

    Statements

    0 references
    526,084.0 Euro
    0 references
    618,922.0 Euro
    0 references
    85.0 percent
    0 references
    30 September 2015
    0 references
    31 March 2018
    0 references
    MUNICÍPIO DE PENELA
    0 references
    Q2990366 (Deleted Item)
    0 references
    0 references

    40°1'45.98"N, 8°23'24.86"W
    0 references
    A operação consiste na execução de 7.615,07ml de coletores gravíticos e uma conduta elevatória numa extensão total de 472ml e 277 ramais de ligação, com ligação ao subsistema de penela.A operação contempla a construção de sub-bacias que irão drenar os lugares de Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Moinhos que assegurarão o transporte gravítico dos efluentes com ligação ao emissário “em alta”. (Portuguese)
    0 references
    The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English)
    9 July 2021
    0 references
    Penela
    0 references

    Identifiers

    POSEUR-03-2012-FC-000565
    0 references