Sand — Horkov East (Q19003): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The purpose of the above construction works is the transition from heat to hot water in the area in the South, Dr Horáková, Čapkova, on behalf of the Land and America II. The area will be supplied by heat from a new hot water distribution system, in a system of two-tube pre-insulated pipes stored freely in the route of an existing steam or secondary heat channel. The new mountain range will replace the current water vapour, the need to adapt tec...) |
(Removed claims) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 19,608,830.43 Czech koruna / rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 784,353.2172 Euro / rank | |||||||||||||||
Property / EU contribution: 784,353.2172 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 784,353.2172 Euro / qualifier | |||||||||||||||
|
Revision as of 16:55, 3 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Sand — Horkov East |
Project in Czech Republic financed by DG Regio |
Statements
65,362,768.11 Czech koruna
0 references
29.9999999954102 percent
0 references
12 December 2016
0 references
27 November 2018
0 references
30 November 2018
0 references
Teplárna Písek, a.s.
0 references
39701
0 references
Účelem výše uvedené stavby je přechod z parního zásobování teplem na horkovodní v oblasti sídliště Jih, Dr. Horákové, Čapkova, Za Kapličkou a Amerika II. Oblast bude zásobována teplem z nového horkovodního rozvodu , v systému dvoutrubkového předizolovaného potrubí uloženém volně v zemní rýze v trase stávajícího parovodního nebo sekundárního tepelného kanálu. Nový horkovod nahradí současný parovod, budou potřeby úpravy technologie ve stávajících stanicích a montáž nových stanic . a. (Czech)
0 references
The purpose of the above construction works is the transition from heat to hot water in the area in the South, Dr Horáková, Čapkova, on behalf of the Land and America II. The area will be supplied by heat from a new hot water distribution system, in a system of two-tube pre-insulated pipes stored freely in the route of an existing steam or secondary heat channel. The new mountain range will replace the current water vapour, the need to adapt technology in existing stations and the installation of new stations. (English)
0 references
Identifiers
CZ.01.3.15/0.0/0.0/15_025/0006057
0 references