JIH heating plant — biomass boiler, heat distribution boiler, DPST (Q15342): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Installation of a biomass boiler with a power of 5.6 MW, expansion of the heat distribution from the Heat Plant by JIH, in connection with the connection of new customers. Installation of new transfer stations, installation and construction of booster stations., Adding English summary)
(‎Removed claims)
Property / EU contribution
23,428,276.0 Czech koruna
Amount23,428,276.0 Czech koruna
UnitCzech koruna
 
Property / EU contribution: 23,428,276.0 Czech koruna / rank
Normal rank
 
Property / EU contribution
937,131.04 Euro
Amount937,131.04 Euro
UnitEuro
 
Property / EU contribution: 937,131.04 Euro / rank
Preferred rank
 
Property / EU contribution: 937,131.04 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / EU contribution: 937,131.04 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 16:49, 3 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
JIH heating plant — biomass boiler, heat distribution boiler, DPST
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    29,285,345.0 Czech koruna
    0 references
    1,171,413.8 Euro
    10 January 2020
    0 references
    80 percent
    0 references
    31 August 2017
    0 references
    5 March 2019
    0 references
    15 March 2019
    0 references
    BIOMASS ENERGY k. s.
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Instalace kotle na spalování biomasy o výkonu 5,6 MW, rozšíření rozvodů tepla z Teplárny JIH v souvislosti s napojením nových odběratelů. Instalace nových předávacích stanic, instalace a výstavba posilovací stanice. a. (Czech)
    0 references
    Installation of a biomass boiler with a power of 5.6 MW, expansion of the heat distribution from the Heat Plant by JIH, in connection with the connection of new customers. Installation of new transfer stations, installation and construction of booster stations. (English)
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/16_130/0011043
    0 references