ENERGY SAVING IN THE PUBLIC LIGHTS OF THE VILAR DISTRICT COUNCIL (Q3176269): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item)
Property / budget
 
106,286.4 Euro
Amount106,286.4 Euro
UnitEuro
Property / budget: 106,286.4 Euro / rank
 
Normal rank
Property / co-financing rate
 
80.0 percent
Amount80.0 percent
Unitpercent
Property / co-financing rate: 80.0 percent / rank
 
Normal rank
Property / EU contribution
 
85,029.12 Euro
Amount85,029.12 Euro
UnitEuro
Property / EU contribution: 85,029.12 Euro / rank
 
Normal rank

Revision as of 17:10, 20 October 2021

Project Q3176269 in Spain
Language Label Description Also known as
English
ENERGY SAVING IN THE PUBLIC LIGHTS OF THE VILAR DISTRICT COUNCIL
Project Q3176269 in Spain

    Statements

    0 references
    0 references
    85,029.12 Euro
    0 references
    106,286.4 Euro
    0 references
    80.0 percent
    0 references
    10 December 2019
    0 references
    10 August 2022
    0 references
    CONCELLO VILLAR BARRIO
    0 references
    0 references

    42°9'37.04"N, 7°36'40.00"W
    0 references
    32089
    0 references
    "La renovación del alumbrado exterior en el Municipio de Vilar de Barrio en la provincia de Ourense consiste en la sustitución de las luminarias existentes (VSAPy VM) por luminarias LED más eficientes. En concreto, se sustituirán 170 luminarias y se actuará en 3 de los 21 cuadros de mando para adaptarlos a la normativa vigente. Con la mencionada actuación se disminuirá la potencia instalada de 14,98 kW a 5,88 kW, consiguiéndose un ahorro energético estimado del 71,52%._x000D_ Las características técnicas completas y detalladas del proyecto son las especificadas en el documento definitivo de la memoria técnica de la actuación presentado por el solicitante._x000D_ " (Spanish)
    0 references
    The renovation of the exterior lighting in the Municipality of Vilar de Barrio in the province of Ourense consists in the replacement of existing luminaires (VSAPy VM) with more efficient LED luminaires. In particular, 170 luminaires will be replaced and operated on 3 of the 21 control panels to adapt them to current regulations. With this performance, the installed power will be reduced from 14.98 kW to 5.88 kW, with an estimated energy saving of 71.52%. The complete and detailed technical characteristics of the project are those specified in the final document of the technical report of the action submitted by the applicant. (English)
    0 references
    Vilar de Barrio
    0 references

    Identifiers

    FE17DUS03607
    0 references