Upgrading of the existing track Maribor — Šentilj — State border (Q3273620): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in slovenia one item from slovenia)
Property / intervention field
 
Property / intervention field: Railways (TEN-T Core) / rank
 
Normal rank
Property / EU contribution
 
101,000,000.0 Euro
Amount101,000,000.0 Euro
UnitEuro
Property / EU contribution: 101,000,000.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 15:05, 20 October 2021

Project Q3273620 in Slovakia
Language Label Description Also known as
English
Upgrading of the existing track Maribor — Šentilj — State border
Project Q3273620 in Slovakia

    Statements

    0 references
    101,000,000.0 Euro
    0 references
    118,823,529.41 Euro
    0 references
    85.0 percent
    0 references
    11 July 2016
    0 references
    31 December 2023
    0 references
    DIREKCIJA RS ZA INFRASTRUKTURO
    0 references
    0 references
    0 references

    46°3'19.04"N, 14°32'0.17"E
    0 references
    1000
    0 references
    Namen nadgradnje obstoječega tira Maribor-Šentilj-d.m. izhaja iz problematike obstoječega stanja obravnavanega odseka proge, in sicer: omejena zmogljivost obstoječega odseka proge, je ozko grlo z vidika kategorije proge, saj je dovoljena osna obremenitev kategorije C3 (20 ton na os), neustrezna stabilnost in nosilnost spodnjega ustroja (nasip Pesnica, predor Počehova), omejena koristna dolžina postajnih tirov, ki ne omogoča obratovanja vlakov dolžine 740 metrov . (Slovenian)
    0 references
    The purpose of upgrading the existing Maribor-Šentilj-d.m. track stems from the problem of the current state of the section of the line, namely: the limited capacity of an existing section of line is a bottleneck from the point of view of the category of line, since the permissible axle load of category C3 (20 tonnes per axle), the inadequate stability and load capacity of the lower structure (peel embankment, Počehova tunnel), the limited useful length of the station tracks, which does not allow the operation of trains of 740 metres. (English)
    12 October 2021
    0 references