(Created claim: summary (P836): The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an an...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an annual basis. The boiler room will be installed in the existing building of the Secondary Trading School, from where it will take place, in the ground, the heat dissipation to outside users. Eight (8) demand points shall be provided for consumption, each with its own thermal and measuring stations. 450 MWh of thermal energy will be distributed to all. A hot-water connection with a total length of 340 m will be built. At the annual level, 615 surrounded meters of wood chips are expected to be consumed. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an annual basis. The boiler room will be installed in the existing building of the Secondary Trading School, from where it will take place, in the ground, the heat dissipation to outside users. Eight (8) demand points shall be provided for consumption, each with its own thermal and measuring stations. 450 MWh of thermal energy will be distributed to all. A hot-water connection with a total length of 340 m will be built. At the annual level, 615 surrounded meters of wood chips are expected to be consumed. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an annual basis. The boiler room will be installed in the existing building of the Secondary Trading School, from where it will take place, in the ground, the heat dissipation to outside users. Eight (8) demand points shall be provided for consumption, each with its own thermal and measuring stations. 450 MWh of thermal energy will be distributed to all. A hot-water connection with a total length of 340 m will be built. At the annual level, 615 surrounded meters of wood chips are expected to be consumed. (English) / qualifier | |||||||||||||||
point in time: 19 October 2021
|
Revision as of 09:56, 19 October 2021
Project Q3277809 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3277809 in Slovakia |
Statements
224,439.14 Euro
0 references
31 March 2021
0 references
31 December 2021
0 references
ENERGOMONT INVEST D.O.O.
0 references
8250
0 references
Predmet projekta je izgradnja daljinskega sistema ogrevanja na obnovljive vire. Predvidena je izgradnja centralne kotlovnice in toplovoda do uporabnikov. Kotlovnica bo na lesno biomaso (sekance), ki se bodo skladiščili v zalogovniku. V obstoječi kotlovnici se bo zamenjal obstoječ LKO kotel z novim, biomasnim kotlom nazivne moči 250 kW, ki bo na letnem nivoju proizvedel 450 MWh toplotne energije. Kotlovnica bo nameščena v obstoječem objektu Srednje trgovske šole, od koder bo potekal, v zemlji, razvod toplote do zunanjih uporabnikov. Za odjem je predvidenih osem (8) odjemnih mest, ki imajo vsaka svojo toplotno postajo ter merilno postajo. V vse se bo distribuiralo 450 MWh toplotne energije. Zgrajen bo toplovodni priključek v skupni dolžini 340 m. Na letnem nivoju je predvidena poraba 615 nasutih metrov gozdnih sekancev. (Slovenian)
0 references
The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an annual basis. The boiler room will be installed in the existing building of the Secondary Trading School, from where it will take place, in the ground, the heat dissipation to outside users. Eight (8) demand points shall be provided for consumption, each with its own thermal and measuring stations. 450 MWh of thermal energy will be distributed to all. A hot-water connection with a total length of 340 m will be built. At the annual level, 615 surrounded meters of wood chips are expected to be consumed. (English)