CTN MS — Phase 2 — KS (Q3277615): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The planned federal cycling route is 2.3 km in one direction or a double-sided length of 4.6 km. The planned interventions of pavements and cycling paths will be 1.180 m long, of which 960 m on Kroška Street and 220 m on the street of the architect Novak., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
CTN MS — Phase 2 — KS

Revision as of 09:54, 19 October 2021

Project Q3277615 in Slovakia
Language Label Description Also known as
English
CTN MS — Phase 2 — KS
Project Q3277615 in Slovakia

    Statements

    0 references
    707,102.0 Euro
    0 references
    21 June 2018
    0 references
    31 December 2022
    0 references
    MESTNA OBČINA MURSKA SOBOTA
    0 references
    0 references
    0 references

    46°39'50.69"N, 16°10'5.81"E
    0 references
    9000
    0 references
    Načrtovana zvezna kolesarska povezava je dolžine 2,3 km v eno smer oziroma obojestranske dolžine 4,6 km. Nameravani posegi ureditve pločnikov in kolesarskih poti bodo v dolžini 1.180 m, od tega 960 m na Kroški ulici in 220 m na Ulici arhitekta Novaka. (Slovenian)
    0 references
    The planned federal cycling route is 2.3 km in one direction or a double-sided length of 4.6 km. The planned interventions of pavements and cycling paths will be 1.180 m long, of which 960 m on Kroška Street and 220 m on the street of the architect Novak. (English)
    19 October 2021
    0 references

    Identifiers

    OP20.07535
    0 references