Q3267799 (Q3267799): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): WITH THIS OPERATION, ACTIONS WILL BE CARRIED OUT FOR THE PREVENTION AND DISASTER MANAGEMENT OF THE ROUND POND DAM (CÁDIZ), SO AS TO ENSURE COMPLIANCE WITH OE.5.1.1. DEVELOPMENT OF KNOWLEDGE AND DEVELOPMENT OF PLANS FOR CLIMATE CHANGE ADAPTATION AND RISK PREVENTION, INCLUDING EARLY WARNING, MONITORING AND EVALUATION SYSTEMS: — DISASTER PREVENTION SYSTEMS FOR ROUND POND DAM. # IMPROVEMENTS IN EXISTING INSTRUMENTATION AND AUTOMATION, MEASURED IN RE...)
Property / summary
 
WITH THIS OPERATION, ACTIONS WILL BE CARRIED OUT FOR THE PREVENTION AND DISASTER MANAGEMENT OF THE ROUND POND DAM (CÁDIZ), SO AS TO ENSURE COMPLIANCE WITH OE.5.1.1. DEVELOPMENT OF KNOWLEDGE AND DEVELOPMENT OF PLANS FOR CLIMATE CHANGE ADAPTATION AND RISK PREVENTION, INCLUDING EARLY WARNING, MONITORING AND EVALUATION SYSTEMS: — DISASTER PREVENTION SYSTEMS FOR ROUND POND DAM. # IMPROVEMENTS IN EXISTING INSTRUMENTATION AND AUTOMATION, MEASURED IN REAL TIME. # NEW INSTRUMENTATION. MORE CONTROL SECTIONS WITH VIBRATING STRING PIEZOMETERS, FOUNDATION DRAINAGE FOR SUBPRESSURE CONTROL, FILTRATION CONTROL BY INSTALLING GAUGES, AND IMPROVEMENTS IN THERMAL AUSCULTATION AND TOPOGRAPHIC AUSCULTATION, LEVELING AND COLLIMATION. # VARIOUS IMPROVEMENTS IN INSTRUMENTATION AND AIDS TO DECISION IN AUSCULTATION AND EXTREME PRECIPITATION. THIS WILL MAKE IT POSSIBLE TO MONITOR AND CONTROL THE VARIOUS CONTROL SYSTEMS CURRENTLY INSTALLED IN THE DAM AND THE NEW ONES TO BE INSTALLED, METEOROLOGICAL, RESERVOIR LEVEL AND SEWAGE ORGAN SIGNALS. — ROUND POND DAM DISASTER MANAGEMENT SYSTEMS. ACCORDING TO THE EMERGENCY PLAN, THE FOLLOWING COMMUNICATIONS SYSTEMS WILL BE USED: EMERGENCY ROOM. FOR THIS PURPOSE, THE EXISTING BUILDING UNITS WILL BE USED, WITH THE SPACE REQUIREMENTS AND NEEDS TO ACCOMMODATE THE EMERGENCY PLAN EQUIPMENT, AND EQUIPMENT AND FACILITIES ARE ONLY NECESSARY. THE CONSIGNMENTS NECESSARY FOR THEIR EQUIPMENT SHALL BE COLLECTED. # PROVIDE THE MEANS OF COMMUNICATION PROVIDED FOR IN THE EMERGENCY PLAN, IN COMPLIANCE WITH THE BASIC PLANNING GUIDELINE FOR CIVIL PROTECTION AGAINST FLOOD RISK. # SUPPORT POWER SUPPLY EQUIPMENT. # CHECKPOINT COMPUTER EQUIPMENT. # COMMUNICATIONS AND INCIDENT MANAGEMENT SOFTWARE (DISASTER MANAGEMENT SOFTWARE). # REDUNDANT COMMUNICATION SYSTEMS BETWEEN DAM AND CONTROL CENTRE AND OTHER ORGANISMS (UHF RADIO PMR/VHF, 4G, VSAT, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS REQUIRED). # SYSTEM OF WARNING TO THE POPULATION FORMED BY SIRENS LOCATED IN THE SAME DAM AND IN THE AREA OF THE FIRST HOUR AND A HALF SINCE THE DISASTER OCCURRED (PMR RADIO AND 3G, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS NECESSARY). SIREN EQUIPMENT: DIFFUSERS, UVTD CONTROL UNIT, UV400 AMPLIFIER MODULES AND COMMUNICATIONS MODULE. # TRAINING OF STAFF TO DISSEMINATE THE EMERGENCY SYSTEM. (English)
Property / summary: WITH THIS OPERATION, ACTIONS WILL BE CARRIED OUT FOR THE PREVENTION AND DISASTER MANAGEMENT OF THE ROUND POND DAM (CÁDIZ), SO AS TO ENSURE COMPLIANCE WITH OE.5.1.1. DEVELOPMENT OF KNOWLEDGE AND DEVELOPMENT OF PLANS FOR CLIMATE CHANGE ADAPTATION AND RISK PREVENTION, INCLUDING EARLY WARNING, MONITORING AND EVALUATION SYSTEMS: — DISASTER PREVENTION SYSTEMS FOR ROUND POND DAM. # IMPROVEMENTS IN EXISTING INSTRUMENTATION AND AUTOMATION, MEASURED IN REAL TIME. # NEW INSTRUMENTATION. MORE CONTROL SECTIONS WITH VIBRATING STRING PIEZOMETERS, FOUNDATION DRAINAGE FOR SUBPRESSURE CONTROL, FILTRATION CONTROL BY INSTALLING GAUGES, AND IMPROVEMENTS IN THERMAL AUSCULTATION AND TOPOGRAPHIC AUSCULTATION, LEVELING AND COLLIMATION. # VARIOUS IMPROVEMENTS IN INSTRUMENTATION AND AIDS TO DECISION IN AUSCULTATION AND EXTREME PRECIPITATION. THIS WILL MAKE IT POSSIBLE TO MONITOR AND CONTROL THE VARIOUS CONTROL SYSTEMS CURRENTLY INSTALLED IN THE DAM AND THE NEW ONES TO BE INSTALLED, METEOROLOGICAL, RESERVOIR LEVEL AND SEWAGE ORGAN SIGNALS. — ROUND POND DAM DISASTER MANAGEMENT SYSTEMS. ACCORDING TO THE EMERGENCY PLAN, THE FOLLOWING COMMUNICATIONS SYSTEMS WILL BE USED: EMERGENCY ROOM. FOR THIS PURPOSE, THE EXISTING BUILDING UNITS WILL BE USED, WITH THE SPACE REQUIREMENTS AND NEEDS TO ACCOMMODATE THE EMERGENCY PLAN EQUIPMENT, AND EQUIPMENT AND FACILITIES ARE ONLY NECESSARY. THE CONSIGNMENTS NECESSARY FOR THEIR EQUIPMENT SHALL BE COLLECTED. # PROVIDE THE MEANS OF COMMUNICATION PROVIDED FOR IN THE EMERGENCY PLAN, IN COMPLIANCE WITH THE BASIC PLANNING GUIDELINE FOR CIVIL PROTECTION AGAINST FLOOD RISK. # SUPPORT POWER SUPPLY EQUIPMENT. # CHECKPOINT COMPUTER EQUIPMENT. # COMMUNICATIONS AND INCIDENT MANAGEMENT SOFTWARE (DISASTER MANAGEMENT SOFTWARE). # REDUNDANT COMMUNICATION SYSTEMS BETWEEN DAM AND CONTROL CENTRE AND OTHER ORGANISMS (UHF RADIO PMR/VHF, 4G, VSAT, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS REQUIRED). # SYSTEM OF WARNING TO THE POPULATION FORMED BY SIRENS LOCATED IN THE SAME DAM AND IN THE AREA OF THE FIRST HOUR AND A HALF SINCE THE DISASTER OCCURRED (PMR RADIO AND 3G, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS NECESSARY). SIREN EQUIPMENT: DIFFUSERS, UVTD CONTROL UNIT, UV400 AMPLIFIER MODULES AND COMMUNICATIONS MODULE. # TRAINING OF STAFF TO DISSEMINATE THE EMERGENCY SYSTEM. (English) / rank
 
Normal rank
Property / summary: WITH THIS OPERATION, ACTIONS WILL BE CARRIED OUT FOR THE PREVENTION AND DISASTER MANAGEMENT OF THE ROUND POND DAM (CÁDIZ), SO AS TO ENSURE COMPLIANCE WITH OE.5.1.1. DEVELOPMENT OF KNOWLEDGE AND DEVELOPMENT OF PLANS FOR CLIMATE CHANGE ADAPTATION AND RISK PREVENTION, INCLUDING EARLY WARNING, MONITORING AND EVALUATION SYSTEMS: — DISASTER PREVENTION SYSTEMS FOR ROUND POND DAM. # IMPROVEMENTS IN EXISTING INSTRUMENTATION AND AUTOMATION, MEASURED IN REAL TIME. # NEW INSTRUMENTATION. MORE CONTROL SECTIONS WITH VIBRATING STRING PIEZOMETERS, FOUNDATION DRAINAGE FOR SUBPRESSURE CONTROL, FILTRATION CONTROL BY INSTALLING GAUGES, AND IMPROVEMENTS IN THERMAL AUSCULTATION AND TOPOGRAPHIC AUSCULTATION, LEVELING AND COLLIMATION. # VARIOUS IMPROVEMENTS IN INSTRUMENTATION AND AIDS TO DECISION IN AUSCULTATION AND EXTREME PRECIPITATION. THIS WILL MAKE IT POSSIBLE TO MONITOR AND CONTROL THE VARIOUS CONTROL SYSTEMS CURRENTLY INSTALLED IN THE DAM AND THE NEW ONES TO BE INSTALLED, METEOROLOGICAL, RESERVOIR LEVEL AND SEWAGE ORGAN SIGNALS. — ROUND POND DAM DISASTER MANAGEMENT SYSTEMS. ACCORDING TO THE EMERGENCY PLAN, THE FOLLOWING COMMUNICATIONS SYSTEMS WILL BE USED: EMERGENCY ROOM. FOR THIS PURPOSE, THE EXISTING BUILDING UNITS WILL BE USED, WITH THE SPACE REQUIREMENTS AND NEEDS TO ACCOMMODATE THE EMERGENCY PLAN EQUIPMENT, AND EQUIPMENT AND FACILITIES ARE ONLY NECESSARY. THE CONSIGNMENTS NECESSARY FOR THEIR EQUIPMENT SHALL BE COLLECTED. # PROVIDE THE MEANS OF COMMUNICATION PROVIDED FOR IN THE EMERGENCY PLAN, IN COMPLIANCE WITH THE BASIC PLANNING GUIDELINE FOR CIVIL PROTECTION AGAINST FLOOD RISK. # SUPPORT POWER SUPPLY EQUIPMENT. # CHECKPOINT COMPUTER EQUIPMENT. # COMMUNICATIONS AND INCIDENT MANAGEMENT SOFTWARE (DISASTER MANAGEMENT SOFTWARE). # REDUNDANT COMMUNICATION SYSTEMS BETWEEN DAM AND CONTROL CENTRE AND OTHER ORGANISMS (UHF RADIO PMR/VHF, 4G, VSAT, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS REQUIRED). # SYSTEM OF WARNING TO THE POPULATION FORMED BY SIRENS LOCATED IN THE SAME DAM AND IN THE AREA OF THE FIRST HOUR AND A HALF SINCE THE DISASTER OCCURRED (PMR RADIO AND 3G, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS NECESSARY). SIREN EQUIPMENT: DIFFUSERS, UVTD CONTROL UNIT, UV400 AMPLIFIER MODULES AND COMMUNICATIONS MODULE. # TRAINING OF STAFF TO DISSEMINATE THE EMERGENCY SYSTEM. (English) / qualifier
 
point in time: 14 October 2021
Timestamp+2021-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:33, 14 October 2021

Project Q3267799 in Spain
Language Label Description Also known as
English
No label defined
Project Q3267799 in Spain

    Statements

    0 references
    68,675,964.0 Euro
    0 references
    85,844,955.0 Euro
    0 references
    80.0 percent
    0 references
    20 December 2018
    0 references
    30 December 2020
    0 references
    JUNTA DE ANDALUCIA
    0 references

    42°26'41.71"N, 7°22'54.52"W
    0 references
    11008
    0 references
    CON ESTA OPERACIÓN SE VAN A REALIZAR ACTUACIONES PARA LA PREVENCIÓN Y GESTIÓN DE CATÁSTROFES DE LA PRESA DE CHARCO REDONDO (CÁDIZ), DE MANERA QUE SE GARANTICE EL CUMPLIMIENTO DEL OE.5.1.1. DESARROLLO DE CONOCIMIENTOS Y ELABORACIÓN DE PLANES EN RELACIÓN CON LA ADAPTACIÓN AL CAMBIO CLIMÁTICO Y LA PREVENCIÓN DE RIESGOS, INCLUYENDO LOS SISTEMAS DE ALERTA TEMPRANA, DE SEGUIMIENTO Y EVALUACIÓN: - SISTEMAS DE PREVENCIÓN DE CATÁSTROFES PRESA DE CHARCO REDONDO. # MEJORAS EN LA INSTRUMENTACIÓN EXISTENTE Y SU AUTOMATIZACIÓN, CON MEDIDA EN TIEMPO REAL. # NUEVA INSTRUMENTACIÓN. MÁS SECCIONES DE CONTROL CON PIEZÓMETROS DE CUERDA VIBRANTE, DRENAJE DE CIMIENTOS PARA CONTROL DE SUBPRESIONES, CONTROL DE FILTRACIONES MEDIANTE LA INSTALACIÓN DE AFORADORES, Y MEJORAS DE LA AUSCULTACIÓN TÉRMICA Y DE LA AUSCULTACIÓN TOPOGRÁFICA, NIVELACIÓN Y COLIMACIÓN. # MEJORAS VARIAS EN LA INSTRUMENTACIÓN Y AYUDAS A LA DECISIÓN EN AUSCULTACIÓN Y PRECIPITACIÓN EXTREMA. CON ELLO SE POSIBILITARÁ LA MONITORIZACIÓN Y CONTROL DE LOS DISTINTOS SISTEMAS DE CONTROL ACTUALMENTE INSTALADOS EN LA PRESA Y LOS NUEVOS A INSTALAR, METEOROLÓGICA, NIVEL DE EMBALSE Y SEÑALES DE ÓRGANOS DE DESAGÜE. - SISTEMAS DE GESTIÓN DE CATÁSTROFES PRESA DE CHARCO REDONDO. SEGÚN EL PLAN DE EMERGENCIA SE UTILIZARÁN LOS SIGUIENTES SISTEMAS DE COMUNICACIONES: # SALA DE EMERGENCIA. PARA ESTE FIN SE UTILIZARÁN LAS DEPENDENCIAS DE EDIFICIOS YA CONSTRUIDOS, CON LOS REQUISITOS DE ESPACIO Y NECESIDADES PARA ALOJAR LOS EQUIPOS DEL PLAN DE EMERGENCIA, SIENDO TAN SOLO NECESARIO EL ACONDICIONAMIENTO DE EQUIPOS E INSTALACIONES. SE RECOGERÁN LAS PARTIDAS NECESARIAS PARA SU EQUIPAMIENTO. # DOTAR DE LOS MEDIOS DE COMUNICACIÓN PREVISTOS EN EL PLAN DE EMERGENCIA, PARA CUMPLIMIENTO DE LO ESTABLECIDO EN LA DIRECTRIZ BÁSICA DE PLANIFICACIÓN PARA PROTECCIÓN CIVIL ANTE EL RIESGO DE INUNDACIONES. # EQUIPOS DE ALIMENTACIÓN ELÉCTRICA DE SOPORTE. # EQUIPOS INFORMÁTICOS DE PUESTO DE CONTROL. # SOFTWARE DE GESTIÓN DE LAS COMUNICACIONES E INCIDENCIAS (SOFTWARE DE GESTIÓN DE CATÁSTROFES). # SISTEMAS DE COMUNICACIÓN REDUNDANTES ENTRE LA PRESA Y EL CENTRO DE CONTROL Y OTROS ORGANISMOS (RADIO UHF PMR/VHF, 4G, VSAT, AUNQUE ES NECESARIO ESTUDIO DE COBERTURA ACÚSTICA Y RADIOELÉCTRICA). # SISTEMA DE AVISO A LA POBLACIÓN FORMADO POR SIRENAS UBICADAS EN LA MISMA PRESA Y EN LA ZONA DE LA PRIMERA HORA Y MEDIA DESDE QUE SE PRODUCE LA CATÁSTROFE (RADIO PMR Y 3G, AUNQUE ES NECESARIO ESTUDIO DE COBERTURA ACÚSTICA Y RADIOELÉCTRICA). EQUIPAMIENTO DE SIRENAS: DIFUSORES, UNIDAD DE CONTROL UVTD, MÓDULOS AMPLIFICADORES UV400 Y MÓDULO DE COMUNICACIONES. # FORMACIÓN DEL PERSONAL PARA DIFUSIÓN DEL SISTEMA DE EMERGENCIA. (Spanish)
    0 references
    WITH THIS OPERATION, ACTIONS WILL BE CARRIED OUT FOR THE PREVENTION AND DISASTER MANAGEMENT OF THE ROUND POND DAM (CÁDIZ), SO AS TO ENSURE COMPLIANCE WITH OE.5.1.1. DEVELOPMENT OF KNOWLEDGE AND DEVELOPMENT OF PLANS FOR CLIMATE CHANGE ADAPTATION AND RISK PREVENTION, INCLUDING EARLY WARNING, MONITORING AND EVALUATION SYSTEMS: — DISASTER PREVENTION SYSTEMS FOR ROUND POND DAM. # IMPROVEMENTS IN EXISTING INSTRUMENTATION AND AUTOMATION, MEASURED IN REAL TIME. # NEW INSTRUMENTATION. MORE CONTROL SECTIONS WITH VIBRATING STRING PIEZOMETERS, FOUNDATION DRAINAGE FOR SUBPRESSURE CONTROL, FILTRATION CONTROL BY INSTALLING GAUGES, AND IMPROVEMENTS IN THERMAL AUSCULTATION AND TOPOGRAPHIC AUSCULTATION, LEVELING AND COLLIMATION. # VARIOUS IMPROVEMENTS IN INSTRUMENTATION AND AIDS TO DECISION IN AUSCULTATION AND EXTREME PRECIPITATION. THIS WILL MAKE IT POSSIBLE TO MONITOR AND CONTROL THE VARIOUS CONTROL SYSTEMS CURRENTLY INSTALLED IN THE DAM AND THE NEW ONES TO BE INSTALLED, METEOROLOGICAL, RESERVOIR LEVEL AND SEWAGE ORGAN SIGNALS. — ROUND POND DAM DISASTER MANAGEMENT SYSTEMS. ACCORDING TO THE EMERGENCY PLAN, THE FOLLOWING COMMUNICATIONS SYSTEMS WILL BE USED: EMERGENCY ROOM. FOR THIS PURPOSE, THE EXISTING BUILDING UNITS WILL BE USED, WITH THE SPACE REQUIREMENTS AND NEEDS TO ACCOMMODATE THE EMERGENCY PLAN EQUIPMENT, AND EQUIPMENT AND FACILITIES ARE ONLY NECESSARY. THE CONSIGNMENTS NECESSARY FOR THEIR EQUIPMENT SHALL BE COLLECTED. # PROVIDE THE MEANS OF COMMUNICATION PROVIDED FOR IN THE EMERGENCY PLAN, IN COMPLIANCE WITH THE BASIC PLANNING GUIDELINE FOR CIVIL PROTECTION AGAINST FLOOD RISK. # SUPPORT POWER SUPPLY EQUIPMENT. # CHECKPOINT COMPUTER EQUIPMENT. # COMMUNICATIONS AND INCIDENT MANAGEMENT SOFTWARE (DISASTER MANAGEMENT SOFTWARE). # REDUNDANT COMMUNICATION SYSTEMS BETWEEN DAM AND CONTROL CENTRE AND OTHER ORGANISMS (UHF RADIO PMR/VHF, 4G, VSAT, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS REQUIRED). # SYSTEM OF WARNING TO THE POPULATION FORMED BY SIRENS LOCATED IN THE SAME DAM AND IN THE AREA OF THE FIRST HOUR AND A HALF SINCE THE DISASTER OCCURRED (PMR RADIO AND 3G, ALTHOUGH ACOUSTIC AND RADIO COVERAGE STUDY IS NECESSARY). SIREN EQUIPMENT: DIFFUSERS, UVTD CONTROL UNIT, UV400 AMPLIFIER MODULES AND COMMUNICATIONS MODULE. # TRAINING OF STAFF TO DISSEMINATE THE EMERGENCY SYSTEM. (English)
    14 October 2021
    0 references
    Barrios, Los
    0 references

    Identifiers

    A1511087M80014
    0 references