Q3259906 (Q3259906): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The proposed action is divided into: Drafting of the Project for the execution of the Sealing Work and geological study of the ground to determine the stability of the site. Works by Sealado del Vertedero. These works shall consist of: Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass Cleansing of the landfill environment and incorporation into the waste mass Adequation of the was...) |
||||||||||||||
Property / summary | |||||||||||||||
The proposed action is divided into: Drafting of the Project for the execution of the Sealing Work and geological study of the ground to determine the stability of the site. Works by Sealado del Vertedero. These works shall consist of: Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass Cleansing of the landfill environment and incorporation into the waste mass Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes Coverage of the landfill area by means of an impermeable barrier that prevents the entry of water from the waste mass and which supports vegetation in its outer layer. Management of surface rainwater over the cover layer and surface runoff waters. Leachate management. Collection and treatment of gases generated by the decomposition of waste. Project management and Health and Safety Coordinator: Due to the actions represented by the execution of the works of the Sealado and the diversity and specialisation of the works, it is necessary a full and intense dedication to the Works Directorate that allows the adjustment between the execution of the project and the phases and deadlines foreseen for its execution. (English) | |||||||||||||||
Property / summary: The proposed action is divided into: Drafting of the Project for the execution of the Sealing Work and geological study of the ground to determine the stability of the site. Works by Sealado del Vertedero. These works shall consist of: Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass Cleansing of the landfill environment and incorporation into the waste mass Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes Coverage of the landfill area by means of an impermeable barrier that prevents the entry of water from the waste mass and which supports vegetation in its outer layer. Management of surface rainwater over the cover layer and surface runoff waters. Leachate management. Collection and treatment of gases generated by the decomposition of waste. Project management and Health and Safety Coordinator: Due to the actions represented by the execution of the works of the Sealado and the diversity and specialisation of the works, it is necessary a full and intense dedication to the Works Directorate that allows the adjustment between the execution of the project and the phases and deadlines foreseen for its execution. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The proposed action is divided into: Drafting of the Project for the execution of the Sealing Work and geological study of the ground to determine the stability of the site. Works by Sealado del Vertedero. These works shall consist of: Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass Cleansing of the landfill environment and incorporation into the waste mass Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes Coverage of the landfill area by means of an impermeable barrier that prevents the entry of water from the waste mass and which supports vegetation in its outer layer. Management of surface rainwater over the cover layer and surface runoff waters. Leachate management. Collection and treatment of gases generated by the decomposition of waste. Project management and Health and Safety Coordinator: Due to the actions represented by the execution of the works of the Sealado and the diversity and specialisation of the works, it is necessary a full and intense dedication to the Works Directorate that allows the adjustment between the execution of the project and the phases and deadlines foreseen for its execution. (English) / qualifier | |||||||||||||||
point in time: 14 October 2021
|
Revision as of 11:38, 14 October 2021
Project Q3259906 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3259906 in Spain |
Statements
1,128,000.0 Euro
0 references
1,410,000.0 Euro
0 references
80.0 percent
0 references
10 October 2019
0 references
31 December 2020
0 references
JUNTA DE ANDALUCIA
0 references
04035
0 references
La actuación propuesta se divide en: Redacción del Proyecto de ejecución de la Obra de Sellado y estudio geológico del terreno para determinar la estabilidad del mismo. Obras de Sellado del Vertedero. Estas obras consistirán en: Retirada de voluminosos superficiales y transporte a vertedero controlado y/o tratamiento para su incorporación a la masa de residuos Limpieza del entorno del vertedero e incorporación a la masa de residuos Adecuación de la masa de residuos, nivelación de superficies y estabilización física para asegurar la estabilidad de los taludes Cobertura del área de vertido mediante una barrera impermeable que evite la entrada de agua la masa de residuos y que en su capa externa soporte vegetación. Gestión de aguas superficiales de lluvia sobre la capa de cobertura y de las aguas de escorrentía superficiales. Gestión de lixiviados. Recogida y tratamiento de los gases que se generen por la descomposición de los residuos. Dirección de obra y Coordinador de Seguridad y Salud: Debido a las actuaciones que representa la ejecución de las obras del Sellado y a la diversidad y especialización de los trabajos, se hace necesaria una dedicación completa e intensa para la Dirección de Obra que posibilite el ajuste entre la ejecución del proyecto y las fases y plazos previstos para su ejecución. (Spanish)
0 references
The proposed action is divided into: Drafting of the Project for the execution of the Sealing Work and geological study of the ground to determine the stability of the site. Works by Sealado del Vertedero. These works shall consist of: Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass Cleansing of the landfill environment and incorporation into the waste mass Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes Coverage of the landfill area by means of an impermeable barrier that prevents the entry of water from the waste mass and which supports vegetation in its outer layer. Management of surface rainwater over the cover layer and surface runoff waters. Leachate management. Collection and treatment of gases generated by the decomposition of waste. Project management and Health and Safety Coordinator: Due to the actions represented by the execution of the works of the Sealado and the diversity and specialisation of the works, it is necessary a full and intense dedication to the Works Directorate that allows the adjustment between the execution of the project and the phases and deadlines foreseen for its execution. (English)
14 October 2021
0 references
Cuevas del Almanzora
0 references
Identifiers
A1651089M30022
0 references