SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA) (Q3259903): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The proposed action is divided into:_x000D_ 1/Wedaction of the Sealing Work Implementation Project and geological survey of the ground to determine the stability of the site._x000D_ 2/Filing Works._x000D_ These works will consist of:_x000D_ * Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass_x000D_ * cleaning of the landfill environment and incorporation into the waste mass_x000D_ *...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA) |
Revision as of 11:38, 14 October 2021
Project Q3259903 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA) |
Project Q3259903 in Spain |
Statements
156,000.0 Euro
0 references
195,000.0 Euro
0 references
80.0 percent
0 references
10 October 2019
0 references
31 December 2020
0 references
JUNTA DE ANDALUCIA
0 references
04021
0 references
La actuación propuesta se divide en:_x000D_ 1/ Redacción del Proyecto de ejecución de la Obra de Sellado y estudio geológico del terreno para determinar la estabilidad del mismo._x000D_ 2/ Obras de Sellado del Vertedero._x000D_ Estas obras consistirán en:_x000D_ * Retirada de voluminosos superficiales y transporte a vertedero controlado y/o tratamiento para su incorporación a la masa de residuos_x000D_ * Limpieza del entorno del vertedero e incorporación a la masa de residuos_x000D_ * Adecuación de la masa de residuos, nivelación de superficies y estabilización física para asegurar la estabilidad de los taludes_x000D_ * Cobertura del área de vertido mediante una barrera impermeable que evite la entrada de agua la masa de residuos y que en su capa externa soporte vegetación._x000D_ * Gestión de aguas superficiales de lluvia sobre la capa de cobertura y de las aguas de escorrentía superficiales._x000D_ * Gestión de lixiviados._x000D_ * Recogida y tratamiento de los gases que se generen por la descomposición de los residuos._x000D_ 3/ Dirección de obra y Coordinador de Seguridad y Salud. (Spanish)
0 references
The proposed action is divided into:_x000D_ 1/Wedaction of the Sealing Work Implementation Project and geological survey of the ground to determine the stability of the site._x000D_ 2/Filing Works._x000D_ These works will consist of:_x000D_ * Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass_x000D_ * cleaning of the landfill environment and incorporation into the waste mass_x000D_ * Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes_x000D_ * Coverage of the discharge area by means of an impermeable barrier that prevents the entry of water from the waste mass and supports vegetation in its outer layer._x000D_ * Management of rain surface water over the cover layer and runoff water surfaces._x000D_ * Leachate management._x000D_ * Collection and treatment of gases generated by the decomposition of waste._x000D_ 3/Management and Health and Safety Coordinator. (English)
14 October 2021
0 references
Bayarque
0 references
Identifiers
A1651089M30023
0 references