SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA) (Q3259903): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The proposed action is divided into:_x000D_ 1/Wedaction of the Sealing Work Implementation Project and geological survey of the ground to determine the stability of the site._x000D_ 2/Filing Works._x000D_ These works will consist of:_x000D_ * Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass_x000D_ * cleaning of the landfill environment and incorporation into the waste mass_x000D_ *...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA)

Revision as of 11:38, 14 October 2021

Project Q3259903 in Spain
Language Label Description Also known as
English
SEALING OF BAYARQUE (RIO) LANDFILL (ALMERIA)
Project Q3259903 in Spain

    Statements

    0 references
    156,000.0 Euro
    0 references
    195,000.0 Euro
    0 references
    80.0 percent
    0 references
    10 October 2019
    0 references
    31 December 2020
    0 references
    JUNTA DE ANDALUCIA
    0 references

    37°19'50.48"N, 2°26'9.38"W
    0 references
    04021
    0 references
    La actuación propuesta se divide en:_x000D_ 1/ Redacción del Proyecto de ejecución de la Obra de Sellado y estudio geológico del terreno para determinar la estabilidad del mismo._x000D_ 2/ Obras de Sellado del Vertedero._x000D_ Estas obras consistirán en:_x000D_ * Retirada de voluminosos superficiales y transporte a vertedero controlado y/o tratamiento para su incorporación a la masa de residuos_x000D_ * Limpieza del entorno del vertedero e incorporación a la masa de residuos_x000D_ * Adecuación de la masa de residuos, nivelación de superficies y estabilización física para asegurar la estabilidad de los taludes_x000D_ * Cobertura del área de vertido mediante una barrera impermeable que evite la entrada de agua la masa de residuos y que en su capa externa soporte vegetación._x000D_ * Gestión de aguas superficiales de lluvia sobre la capa de cobertura y de las aguas de escorrentía superficiales._x000D_ * Gestión de lixiviados._x000D_ * Recogida y tratamiento de los gases que se generen por la descomposición de los residuos._x000D_ 3/ Dirección de obra y Coordinador de Seguridad y Salud. (Spanish)
    0 references
    The proposed action is divided into:_x000D_ 1/Wedaction of the Sealing Work Implementation Project and geological survey of the ground to determine the stability of the site._x000D_ 2/Filing Works._x000D_ These works will consist of:_x000D_ * Removal of bulky surfaces and transport to controlled landfill or treatment for incorporation into the waste mass_x000D_ * cleaning of the landfill environment and incorporation into the waste mass_x000D_ * Adequation of the waste mass, surface leveling and physical stabilisation to ensure the stability of the slopes_x000D_ * Coverage of the discharge area by means of an impermeable barrier that prevents the entry of water from the waste mass and supports vegetation in its outer layer._x000D_ * Management of rain surface water over the cover layer and runoff water surfaces._x000D_ * Leachate management._x000D_ * Collection and treatment of gases generated by the decomposition of waste._x000D_ 3/Management and Health and Safety Coordinator. (English)
    14 October 2021
    0 references
    Bayarque
    0 references

    Identifiers

    A1651089M30023
    0 references