EMERGENCY ADAPTATION CHANNELS COASTAL ZONE T.M. OF MALAGA AND VÉLEZ-MALAGA (Q3259764): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The current state of the flooding channels determines that with little precipitation there will be overflows. Given the loss of drain functionality of the channels and being high the probability that new rains will occur at this time of the year, it is essential to restore the_x000D_ drain functionality of the channels, through restoration and removal of plant remains and sludge._x000D_ The work to be developed is estimated to be the following:_...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
EMERGENCY ADAPTATION CHANNELS COASTAL ZONE T.M. OF MALAGA AND VÉLEZ-MALAGA |
Revision as of 11:31, 14 October 2021
Project Q3259764 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | EMERGENCY ADAPTATION CHANNELS COASTAL ZONE T.M. OF MALAGA AND VÉLEZ-MALAGA |
Project Q3259764 in Spain |
Statements
10,449,076.0 Euro
0 references
13,061,345.0 Euro
0 references
80.0 percent
0 references
20 October 2019
0 references
30 November 2020
0 references
JUNTA DE ANDALUCIA
0 references
29067
0 references
El estado actual de los cauces tras las inundaciones determina que con poca precipitación se produzcan desbordamientos. Ante la pérdida de funcionalidad de desagüe de los cauces y siendo alta la probabilidad de que en esta época del año se produzcan nuevas lluvias, por lo que es imprescindible restablecer la_x000D_ funcionalidad de desagüe de los cauces, mediante actuaciones de restauración y retirada de restos vegetales y lodos._x000D_ Los trabajos a desarrollar se estima que son los siguientes:_x000D_ • ¿rabajos manuales, apeos, podas, desbroces y limpiezas_x000D_ • Trabajos sobre la morfología del cauce con medios mecánicos_x000D_ • Transporte de materiales a vertedero_x000D_ • Trabajos de ejecución y conservación de obras de defensa_x000D_ • Obra de defensa de márgenes. (Spanish)
0 references
The current state of the flooding channels determines that with little precipitation there will be overflows. Given the loss of drain functionality of the channels and being high the probability that new rains will occur at this time of the year, it is essential to restore the_x000D_ drain functionality of the channels, through restoration and removal of plant remains and sludge._x000D_ The work to be developed is estimated to be the following:_x000D_ • manuals, climbing, pruning, clearing and cleaning_x000D_ • Work on the morphology of the channel with mechanical means_x000D_ • Transport of materials to landfill_x000D_ • Works for the execution and conservation of defense works_x000D_ • Margin defense work. (English)
14 October 2021
0 references
Málaga
0 references
Identifiers
A1522087M70014
0 references