Q3228601 (Q3228601): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The church currently faces the screed protected by a rectangular platform. The area considered original corresponds to approximately 80 % of the total, the rest being repaired over time with various mortars and different materials, among which greyish tone cements abound._x000D_ Once the existing floor has been dismantled, the treatment will proceed to the integral cleaning of the surface, removal of carbonatations, consolidation of disintegrate...) |
||||||||||||||
Property / summary | |||||||||||||||
The church currently faces the screed protected by a rectangular platform. The area considered original corresponds to approximately 80 % of the total, the rest being repaired over time with various mortars and different materials, among which greyish tone cements abound._x000D_ Once the existing floor has been dismantled, the treatment will proceed to the integral cleaning of the surface, removal of carbonatations, consolidation of disintegrated mortars, mechanical elimination of unsuitable patches and material reintegration of the faults. Given the special problems involved in the conservation of a screed, the measures necessary for its maintenance are also included. (English) | |||||||||||||||
Property / summary: The church currently faces the screed protected by a rectangular platform. The area considered original corresponds to approximately 80 % of the total, the rest being repaired over time with various mortars and different materials, among which greyish tone cements abound._x000D_ Once the existing floor has been dismantled, the treatment will proceed to the integral cleaning of the surface, removal of carbonatations, consolidation of disintegrated mortars, mechanical elimination of unsuitable patches and material reintegration of the faults. Given the special problems involved in the conservation of a screed, the measures necessary for its maintenance are also included. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The church currently faces the screed protected by a rectangular platform. The area considered original corresponds to approximately 80 % of the total, the rest being repaired over time with various mortars and different materials, among which greyish tone cements abound._x000D_ Once the existing floor has been dismantled, the treatment will proceed to the integral cleaning of the surface, removal of carbonatations, consolidation of disintegrated mortars, mechanical elimination of unsuitable patches and material reintegration of the faults. Given the special problems involved in the conservation of a screed, the measures necessary for its maintenance are also included. (English) / qualifier | |||||||||||||||
point in time: 14 October 2021
|
Revision as of 10:37, 14 October 2021
Project Q3228601 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3228601 in Spain |
Statements
32,851.5 Euro
0 references
65,703.0 Euro
0 references
50.0 percent
0 references
19 February 2018
0 references
4 December 2019
0 references
JUNTA DE CASTILLA Y LEON
0 references
99017
0 references
La iglesia se encuentra actualmente con el solado ¿protegido¿ por una plataforma rectangular. La superficie considerada original se corresponde aproximadamente con un 80% del total, siendo el resto lagunas reparadas en el tiempo con diversos morteros y materiales diferentes, entre los que abundan los cementos de tono grisáceo._x000D_ Una vez desmontada la tarima existente, el tratamiento procederá a la limpieza integral de la superficie, eliminación de carbonataciones, consolidación de morteros desintegrados, eliminación mecánicamente los parcheados no adecuados y reintegración material de las faltas. Dada la especial problemática que supone la conservación de un solado, se incluyen además, las medidas necesarias para su mantenimiento. (Spanish)
0 references
The church currently faces the screed protected by a rectangular platform. The area considered original corresponds to approximately 80 % of the total, the rest being repaired over time with various mortars and different materials, among which greyish tone cements abound._x000D_ Once the existing floor has been dismantled, the treatment will proceed to the integral cleaning of the surface, removal of carbonatations, consolidation of disintegrated mortars, mechanical elimination of unsuitable patches and material reintegration of the faults. Given the special problems involved in the conservation of a screed, the measures necessary for its maintenance are also included. (English)
14 October 2021
0 references
Varios Municipios de Castilla y León
0 references
Identifiers
2017/000966
0 references