NEXT GENERATION BROADBAND COVERAGE PROJECT IN TORELLO (LERIDA) (Q3203153): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operator proposes in this project to deploy a FTTH-GPON network in Torelló (belonging to the municipality of Torelló, province of Barcelona). This network consists of the installation of an OLT header equipment, the deployment of fibre optics and the elements responsible for the optical division for distribution. The objective of coverage envisaged in the project is to provide very high-speed services to 2,629 real estate units., translated_...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
NEXT GENERATION BROADBAND COVERAGE PROJECT IN TORELLO (LERIDA)

Revision as of 00:59, 13 October 2021

Project Q3203153 in Spain
Language Label Description Also known as
English
NEXT GENERATION BROADBAND COVERAGE PROJECT IN TORELLO (LERIDA)
Project Q3203153 in Spain

    Statements

    0 references
    162,827.0 Euro
    0 references
    325,654.0 Euro
    0 references
    50.0 percent
    0 references
    11 May 2015
    0 references
    31 December 2016
    0 references
    ADAMO TELECOM IBERIA SA
    0 references
    0 references

    42°2'52.19"N, 2°15'51.62"E
    0 references
    08285
    0 references
    El operador propone en este proyecto desplegar una red FTTH-GPON en Torelló (perteneciente al municipio de Torelló, provincia de Barcelona). Dicha red consiste en la instalación de un equipo de cabecera OLT, así como el despliegue de fibra óptica y los elementos encargados de la división óptica para la distribución. El objetivo de cobertura previsto en el proyecto es proporcionar servicios de muy alta velocidad a 2.629 unidades inmobiliarias. (Spanish)
    0 references
    The operator proposes in this project to deploy a FTTH-GPON network in Torelló (belonging to the municipality of Torelló, province of Barcelona). This network consists of the installation of an OLT header equipment, the deployment of fibre optics and the elements responsible for the optical division for distribution. The objective of coverage envisaged in the project is to provide very high-speed services to 2,629 real estate units. (English)
    13 October 2021
    0 references
    Torelló
    0 references

    Identifiers

    TSI-061000-2015-089
    0 references