Sustainable urban mobility (Q3195416): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The aim is to pedestrianise and create a bike path — street cycle on Paseo street and adjacent streets, which will make the city more friendly for people and especially for children and that will favor tourism and local commerce. _x000D_ will also be made a cycle-street bike path between urban centre and equipment area. With the aim of connecting the urban area with the equipment area, in which the institute, the football field and the sports ce...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Sustainable urban mobility

Revision as of 23:19, 12 October 2021

Project Q3195416 in Spain
Language Label Description Also known as
English
Sustainable urban mobility
Project Q3195416 in Spain

    Statements

    0 references
    576,000.0 Euro
    0 references
    720,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 December 2018
    0 references
    31 December 2022
    0 references
    AYUNTAMIENTO DE CIEZA
    0 references
    0 references

    43°13'22.94"N, 4°7'29.53"W
    0 references
    30019
    0 references
    Se pretende la peatonalización y la creación de un carril bici - ciclo calle en la calle Paseo y calles adyacentes, que harán la ciudad más amable para las personas y en especial para los niños y que favorecerán el turismo y el comercio local. _x000D_ También se hará un carril bici ciclo- calle entre núcleo urbano y zona equipamientos. Con el objetivo de conectar el entorno del casco urbano con la zona de equipamientos, en la que se encuentra el instituto, el campo de fútbol y el polideportivo, ubicado en la periferia de la zona sureste de Cieza._x000D_ Además, se construirá un aparcamiento disuasorio entre las calles Camino del Molino y José González Díaz. El estacionamiento se convertirá en inteligente a través de la implantación de diferentes sistemas de control y acceso que se llevará a cabo en un cabo a través de la operación Cieza Smart City._x000D_ También se llevarán a cabo actuaciones en movilidad eléctrica. Por último, se instalarán por el núcleo urbano puntos de recarga del vehículo eléctrico con el objetivo de fomentar el empleo de este tipo de transporte sostenible, al menos dos en el entorno de la Plaza de España o el Paseo como centros neurálgicos de la actividad económica de la ciudad. (Spanish)
    0 references
    The aim is to pedestrianise and create a bike path — street cycle on Paseo street and adjacent streets, which will make the city more friendly for people and especially for children and that will favor tourism and local commerce. _x000D_ will also be made a cycle-street bike path between urban centre and equipment area. With the aim of connecting the urban area with the equipment area, in which the institute, the football field and the sports center, located on the periphery of the southeastern area of Cieza._x000D_ In addition, a deterrent car park will be built between Camino del Molino and José González Díaz streets. The parking will become intelligent through the implementation of different control and access systems that will be carried out in one out through the operation Cieza Smart City._x000D_Electric mobility actions will also be carried out. Finally, recharging points of the electric vehicle will be installed by the urban centre with the aim of promoting the use of this type of sustainable transport, at least two in the surroundings of the Plaza de España or the Paseo as nerve centres of the economic activity of the city. (English)
    13 October 2021
    0 references
    Cieza
    0 references

    Identifiers

    FCL01MU0906
    0 references