Fitness Perimeter Zone Santa Engracia Train Ways (Q3166413): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The area south of Via Norte that affects the areas of El Progreso and Santa Engracia is, in some areas, degraded, serving these spaces of illegal landfills and unregulated car parks causing an image of an abandoned area. This operation aims to condition the entire strip to normalise the area, improve the image of the urban environment in its environmental, landscape and urban dimension, thus mitigating the problems of urban and environmental d...)
Property / summary
The area south of Via Norte that affects the areas of El Progreso and Santa Engracia is, in some areas, degraded, serving these spaces of illegal landfills and unregulated car parks causing an image of an abandoned area. This operation aims to condition the entire strip to normalise the area, improve the image of the urban environment in its environmental, landscape and urban dimension, thus mitigating the problems of urban and environmental decline. (English)
 
Property / summary: The area south of Via Norte that affects the areas of El Progreso and Santa Engracia is, in some areas, degraded, serving these spaces of illegal landfills and unregulated car parks causing an image of an abandoned area. This operation aims to condition the entire strip to normalise the area, improve the image of the urban environment in its environmental, landscape and urban dimension, thus mitigating the problems of urban and environmental decline. (English) / rank
Normal rank
 
Property / summary: The area south of Via Norte that affects the areas of El Progreso and Santa Engracia is, in some areas, degraded, serving these spaces of illegal landfills and unregulated car parks causing an image of an abandoned area. This operation aims to condition the entire strip to normalise the area, improve the image of the urban environment in its environmental, landscape and urban dimension, thus mitigating the problems of urban and environmental decline. (English) / qualifier
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 18:18, 12 October 2021

Project Q3166413 in Spain
Language Label Description Also known as
English
Fitness Perimeter Zone Santa Engracia Train Ways
Project Q3166413 in Spain

    Statements

    0 references
    6,006,240.8 Euro
    0 references
    7,507,801.0 Euro
    0 references
    80.0 percent
    0 references
    1 November 2018
    0 references
    28 February 2019
    0 references
    AYUNTAMIENTO DE BADAJOZ
    0 references

    38°52'41.02"N, 6°58'12.72"W
    0 references
    06015
    0 references
    El área sur de Vía Norte que afecta a las zonas de El Progreso y Santa Engracia se encuentra, en algunas zonas, degradada sirviendo estos espacios de vertederos ilegales y aparcamientos de coches no regulados causando una imagen de zona abandonada. Con esta operación se pretende acondicionar toda la franja para normalizar el área, mejorar la imagen del entorno urbano en su dimensión ambiental, paisajística y urbanística, mitigando así los problemas de declive urbano y ambiental. (Spanish)
    0 references
    Badajoz
    0 references

    Identifiers

    FDU01EX0922
    0 references