Improving pedestrian accessibility (Q3172836): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
43°20'55.43"N, 4°3'5.44"W
| |||||||||||
Property / coordinate location: 43°20'55.43"N, 4°3'5.44"W / rank | |||||||||||
Normal rank |
Revision as of 14:25, 9 October 2021
Project Q3172836 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving pedestrian accessibility |
Project Q3172836 in Spain |
Statements
38,261,687.5 Euro
0 references
76,523,375.0 Euro
0 references
50.0 percent
0 references
30 October 2018
0 references
31 May 2021
0 references
AYUNTAMIENTO DE TORRELAVEGA
0 references
39087
0 references
"Esta operación pretende priorizar la mejora de la accesibilidad, conectividad y permeabilidad de los barrios vulnerables, para favorecer su integración con el resto de la ciudad y reducir el transporte privado potenciando la movilidad alternativa no contaminante, con el objetivo de reducir las emisiones de CO2. Incluye la posibilidad de invertir en infraestructuras públicas, elementos de movilidad y sistemas de gestión del tráfico. Las intervenciones definidas están previstas en el Plan de Movilidad Urbana Sostenible (PMUS) de Torrelavega y en el Plan Estratégico de Torrelavega 2016-2026 en cuanto a mejora de la movilidad urbana de la ciudad e incluyen actuaciones para la mejora de la accesibilidad peatonal de Torrelavega y la mejora de la conectividad entre el barrio de El Cerezo y el resto de la ciudad. En concreto se planifican las siguientes actuaciones:_x000D_ _x000D_ - Rehabilitación de las calles Ancha y Carrera_x000D_ _x000D_ - Rehabilitación del Paseo del Niño_x000D_ _x000D_ - Pasarela de conexión del río Saja-Besaya_x000D_ _x000D_ Las actuaciones se describen de forma detallada eb el documento ""Descripción de las actuaciones que forman parte de la operación L2"", anexado a esta Expresión de Interés" (Spanish)
0 references
"This operation aims to prioritize the improvement of accessibility, connectivity and permeability of vulnerable neighborhoods, to favor their integration with the rest of the city and reduce private transport by promoting non-polluting alternative mobility, with the aim of reducing CO2 emissions . Includes the possibility of investing in public infrastructures, mobility elements and traffic management systems. The defined interventions are foreseen in the Sustainable Urban Mobility Plan (SUMP) of Torrelavega and in the Torrelavega Strategic Plan 2016-2026 in terms of improvement of urban mobility in the city and include actions to improve pedestrian accessibility in Torrelavega and improve connectivity between the El Cerezo neighborhood and the rest of the city. Specifically, the following actions are planned:_x000D_ _x000D_ - Rehabilitation of Ancha and Carrera streets_x000D_ _x000D_ - Rehabilitation of the Paseo del Niño_x000D_ _x000D_ - Footbridge connecting the Saja-Besaya river_x000D_ _x000D_ The actions are described in detail in the document "" Description of the actions that are part of the L2 operation "", attached to this Expression of Interest" (English)
0 references
Torrelavega
0 references
Identifiers
FCL3CN00101
0 references