Modernisation of the Integrated Urban Mobility Corridor in the eastern part of Turda (Q2745822): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: beneficiary (P889): (Q2755875)) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2755875 / rank | |||
Normal rank |
Revision as of 12:57, 6 October 2021
Project Q2745822 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the Integrated Urban Mobility Corridor in the eastern part of Turda |
Project Q2745822 in Romania |
Statements
36,662,957.96 Romanian Leu
0 references
43,132,891.71 Romanian Leu
0 references
85.0 percent
0 references
25 November 2016
0 references
31 December 2021
0 references
MUNICIPIUL TURDA
0 references
Obiectivul general al proiectului este: Asigurarea unui serviciu eficient de transport public de călători și îmbunătățirea condiţiilor pentru utilizarea modurilor nemotorizate de transport, în vederea reducerii numărului de deplasări cu transportul privat (cu autoturisme) şi reducerea emisiilor de echivalent CO2 din transport. Astfel, Municipiul Turda urmareste dezvoltarea mobilitatii urbane prin shimbarea accentului de la o mobilitate bazata pe utilizarea autoturismelor la o mobilitate bazata pe mersul me jos, utilizarea bicicletei ca mijloc de deplasare, utilizarea transportului public de inalta calitate si eficienta, reducerea utilizarii autoturismelor in paralel cu utilizarea unor categorii de autoturisme nepoluante. Proiectul vine in intampinarea obiectivului specific 3.2 al prioritatii de investitii 4e, prin implementarea unor masuri strategice, bazate pe datele din Planul de Moiblitate Urbana Durabila a Municipiului Turda, ce vor conduce la promovarea mobilitatii urbane multimodale durabile si la reducerea emisiilor de CO2, ca urmare a îmbunătăţirii eficienţei transportului public de călători, a frecvenţei şi a timpilor săi de parcurs, accesibilităţii, transferului către acesta de la transportul privat cu autoturisme, precum şi a transferului către modurile nemotorizate de transport, cresterea atractivitatii utilizarii mijloacelor de transport public si a modurilor nemotorizate in detrimentul transportului cu autoturismele personale. Rezultatele generale asteptate din cadrul sectiunii „Rezultate” sunt doar la nivelul acestei cereri de finantare. (Romanian)
0 references
The overall objective of the project is to: Ensuring an efficient public passenger transport service and improving the conditions for the use of non-motorised modes of transport, with a view to reducing the number of journeys by private transport (cars) and reducing CO2-equivalent emissions from transport. Thus, Turda Municipality aims to develop urban mobility by shifting the focus from a mobility based on car use to a mobility based on walking, using bicycle as a means of travel, using high quality and efficient public transport, reducing the use of cars in parallel with the use of clean car categories. The project meets the specific objective 3.2 of the investment priority 4e, through the implementation of strategic measures based on data from the Turda Urban Moiblity Plan, which will lead to the promotion of sustainable multimodal urban mobility and the reduction of CO2 emissions, as a result of improving the efficiency of public passenger transport, its frequency and its journey times, accessibility, transfer to it from private transport by car, as well as the transfer to non-motorised modes of transport, increasing the attractiveness of using public transport and non-motorised modes to the detriment of transport with private cars. The expected general results in the “Results” section are only at the level of this financing request. (English)
14 September 2021
0 references
Municipiul Turda, Romania
0 references
Identifiers
118093
0 references