Reduction of energy intensity in MS Salt (Q3109816): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Changing beneficiary name in Slovakian projects)
(‎Created claim: summary (P836): The building of the Maternity School, which is the subject of the project to improve energy efficiency, is the building of a school facility in the ownership of the village Salt and is located in the district of Vranov nad Topľou in the Prešov region. The aim of the project is to implement energy-saving measures. This objective will be achieved through the implementation of the main activity of the project – Increasing the energy efficiency of t...)
Property / summary
 
The building of the Maternity School, which is the subject of the project to improve energy efficiency, is the building of a school facility in the ownership of the village Salt and is located in the district of Vranov nad Topľou in the Prešov region. The aim of the project is to implement energy-saving measures. This objective will be achieved through the implementation of the main activity of the project – Increasing the energy efficiency of the MŠ building in the municipality of Salt, which is materially consistent with the type of main activity – A. Reduction of the energy intensity of public buildings under specific objective 4.3.1 Reduction of energy consumption in the operation of public buildings. The main activity will be the implementation of the following energy measures resulting from the energy audit: Insulation of the external casing, insulation of the roof covering and ceiling basementReplacement of the heating systemReconstruction of the heating systemRealisation of the project, the results of which will be used by the inhabitants of the municipality in the number of 2 563 Ob. will be filled with the following measurable ukazovatele:P0080 Amount of electricity produced in the plant RES MWh/year 0,00P0084 Amount of thermal energy produced in the plant RES MWh/year 41,4P0103 Estimated annual reduction of greenhouse gas emissions t equilibrium. CO2 11,852P0250 Number of measures to reduce energy consumption implemented in a public building number 3P0470 Number of public buildings at low- or ultra-low-energy level or with almost zero energy demand 1P0612 Floor area of buildings renovated above the minimum requirements m² 787,77P0627 Building energy consumption after implementation of energy efficiency measures MWh/year 118,703P0628 Capacity of energy consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.906P0606 Renewable energy consumption capacity in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 Renewable energy needs in a public building graduation of 0.38 % renewable energy output/year 177,869P0687 Renewable final energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy demand reduction capacity in public buildings 80606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Reducing final energy consumption in public buildings kWh/year 59 166P0689V capacity of electricity consumption of electricity consumption in public buildings 0.0606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689null of electricity consumption capacity from public buildings 0.0606 electricity consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 renewable energy consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity from public buildings 0.0606 Renewable energy needs 0.0606 Renewable energy needs 0.06 Renewable energy consumption 0.0806 Renewable energy production year 0.0869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689Emissions of public buildings (English)
Property / summary: The building of the Maternity School, which is the subject of the project to improve energy efficiency, is the building of a school facility in the ownership of the village Salt and is located in the district of Vranov nad Topľou in the Prešov region. The aim of the project is to implement energy-saving measures. This objective will be achieved through the implementation of the main activity of the project – Increasing the energy efficiency of the MŠ building in the municipality of Salt, which is materially consistent with the type of main activity – A. Reduction of the energy intensity of public buildings under specific objective 4.3.1 Reduction of energy consumption in the operation of public buildings. The main activity will be the implementation of the following energy measures resulting from the energy audit: Insulation of the external casing, insulation of the roof covering and ceiling basementReplacement of the heating systemReconstruction of the heating systemRealisation of the project, the results of which will be used by the inhabitants of the municipality in the number of 2 563 Ob. will be filled with the following measurable ukazovatele:P0080 Amount of electricity produced in the plant RES MWh/year 0,00P0084 Amount of thermal energy produced in the plant RES MWh/year 41,4P0103 Estimated annual reduction of greenhouse gas emissions t equilibrium. CO2 11,852P0250 Number of measures to reduce energy consumption implemented in a public building number 3P0470 Number of public buildings at low- or ultra-low-energy level or with almost zero energy demand 1P0612 Floor area of buildings renovated above the minimum requirements m² 787,77P0627 Building energy consumption after implementation of energy efficiency measures MWh/year 118,703P0628 Capacity of energy consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.906P0606 Renewable energy consumption capacity in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 Renewable energy needs in a public building graduation of 0.38 % renewable energy output/year 177,869P0687 Renewable final energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy demand reduction capacity in public buildings 80606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Reducing final energy consumption in public buildings kWh/year 59 166P0689V capacity of electricity consumption of electricity consumption in public buildings 0.0606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689null of electricity consumption capacity from public buildings 0.0606 electricity consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 renewable energy consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity from public buildings 0.0606 Renewable energy needs 0.0606 Renewable energy needs 0.06 Renewable energy consumption 0.0806 Renewable energy production year 0.0869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689Emissions of public buildings (English) / rank
 
Normal rank
Property / summary: The building of the Maternity School, which is the subject of the project to improve energy efficiency, is the building of a school facility in the ownership of the village Salt and is located in the district of Vranov nad Topľou in the Prešov region. The aim of the project is to implement energy-saving measures. This objective will be achieved through the implementation of the main activity of the project – Increasing the energy efficiency of the MŠ building in the municipality of Salt, which is materially consistent with the type of main activity – A. Reduction of the energy intensity of public buildings under specific objective 4.3.1 Reduction of energy consumption in the operation of public buildings. The main activity will be the implementation of the following energy measures resulting from the energy audit: Insulation of the external casing, insulation of the roof covering and ceiling basementReplacement of the heating systemReconstruction of the heating systemRealisation of the project, the results of which will be used by the inhabitants of the municipality in the number of 2 563 Ob. will be filled with the following measurable ukazovatele:P0080 Amount of electricity produced in the plant RES MWh/year 0,00P0084 Amount of thermal energy produced in the plant RES MWh/year 41,4P0103 Estimated annual reduction of greenhouse gas emissions t equilibrium. CO2 11,852P0250 Number of measures to reduce energy consumption implemented in a public building number 3P0470 Number of public buildings at low- or ultra-low-energy level or with almost zero energy demand 1P0612 Floor area of buildings renovated above the minimum requirements m² 787,77P0627 Building energy consumption after implementation of energy efficiency measures MWh/year 118,703P0628 Capacity of energy consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.906P0606 Renewable energy consumption capacity in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 Renewable energy needs in a public building graduation of 0.38 % renewable energy output/year 177,869P0687 Renewable final energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy demand reduction capacity in public buildings 80606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Reducing final energy consumption in public buildings kWh/year 59 166P0689V capacity of electricity consumption of electricity consumption in public buildings 0.0606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689null of electricity consumption capacity from public buildings 0.0606 electricity consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 renewable energy consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity from public buildings 0.0606 Renewable energy needs 0.0606 Renewable energy needs 0.06 Renewable energy consumption 0.0806 Renewable energy production year 0.0869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689Emissions of public buildings (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:07, 28 September 2021

Project Q3109816 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity in MS Salt
Project Q3109816 in Slovakia

    Statements

    0 references
    369,751.13 Euro
    0 references
    435,001.33 Euro
    0 references
    85.0 percent
    0 references
    4 January 2017
    0 references
    4 January 2019
    0 references
    Obec Soľ
    0 references
    Q3123985 (Deleted Item)
    0 references

    48°55'36.26"N, 21°35'50.39"E
    0 references
    Budova Materskej školy, ktorá je predmetom realizácie projektu na zlepšenie energetickej efektívnosti je budova školského zariadenia vovlastníctve obce Soľ a nachádza sa v okrese Vranov nad Topľou v Prešovskom kraji. Cieľom projektu je realizácia energetických opatrenízameraných na úsporu energie. Tento cieľ bude naplnený prostredníctvom realizácie hlavnej aktivity projektu - Zvýšenie energetickejefektívnosti budovy MŠ v obci Soľ, ktorá je vo vecnom súlade s typom hlavnej aktivity - A. Zníženie energetickej náročnostiverejných budov v rámci špecifického cieľa 4.3.1 Zníženie spotreby energie pri prevádzke verejných budov. Predmetom hlavnej aktivity buderealizácia týchto energetických opatrení vyplývajúcich z energetického auditu: Zateplenie obvodového plášťa, zateplenie strešného plášťa a stropu suterénuVýmena otvorových konštrukciíRekonštrukcia vykurovacieho systémuRealizáciou projektu, ktorého výsledky budú užívať obyvatelia obce v počte 2 563 ob. budú naplnené nasledovné merateľné ukazovatele:P0080 Množstvo elektrickej energie vyrobenej v zariadení OZE MWh/rok 0,00P0084 Množstvo tepelnej energie vyrobenej v zariadení OZE MWh/rok 41,4P0103 Odhadované ročné zníženie emisií skleníkových plynov t ekviv. CO2  11,852P0250 Počet opatrení na zníženie spotreby energie realizovaných vo verejnej budove počet 3P0470 Počet verejných budov na úrovni nízkoenergetickej alebo ultranízkoenergetickej alebo s takmer nulovou potrebou energie počet 1P0612 Podlahová plocha budov obnovených nad rámec minimálnych požiadaviek m2 787,77P0627 Spotreba energie v budove po realizácii opatrení energetickej efektívnosti MWh/rok 118,703P0628 Spotreba energie v budove pred realizáciou opatrení energetickej efektívnosti MWh/rok 177,869P0687 Zníženie konečnej spotreby energie vo verejných budovách kWh/rok  59 166P0689 Zníženie potreby energie vo verejných budovách kWh/rok 136 891P0691 Zníženie produkcie emisií NOx kg/rok 9,36P0692 Zníženie produkcie emisií PM10 kg/rok 0,48P0694 Zníženie produkcie emisií SO2 kg/rok 0,06P0701 Zníženie ročnej spotreby primárnej energie vo verejných budovách kWh/rok 202 613P0705 Zvýšená kapacita výroby elektriny z obnoviteľných zdrojov MWe 0,00P0706 Zvýšená kapacita výroby energie z obnoviteľných zdrojov MW 0,038P0707 Zvýšená kapacita výroby tepla z obnoviteľných zdrojov MWt 0,038 (Slovak)
    0 references
    The building of the Maternity School, which is the subject of the project to improve energy efficiency, is the building of a school facility in the ownership of the village Salt and is located in the district of Vranov nad Topľou in the Prešov region. The aim of the project is to implement energy-saving measures. This objective will be achieved through the implementation of the main activity of the project – Increasing the energy efficiency of the MŠ building in the municipality of Salt, which is materially consistent with the type of main activity – A. Reduction of the energy intensity of public buildings under specific objective 4.3.1 Reduction of energy consumption in the operation of public buildings. The main activity will be the implementation of the following energy measures resulting from the energy audit: Insulation of the external casing, insulation of the roof covering and ceiling basementReplacement of the heating systemReconstruction of the heating systemRealisation of the project, the results of which will be used by the inhabitants of the municipality in the number of 2 563 Ob. will be filled with the following measurable ukazovatele:P0080 Amount of electricity produced in the plant RES MWh/year 0,00P0084 Amount of thermal energy produced in the plant RES MWh/year 41,4P0103 Estimated annual reduction of greenhouse gas emissions t equilibrium. CO2 11,852P0250 Number of measures to reduce energy consumption implemented in a public building number 3P0470 Number of public buildings at low- or ultra-low-energy level or with almost zero energy demand 1P0612 Floor area of buildings renovated above the minimum requirements m² 787,77P0627 Building energy consumption after implementation of energy efficiency measures MWh/year 118,703P0628 Capacity of energy consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.906P0606 Renewable energy consumption capacity in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 Renewable energy needs in a public building graduation of 0.38 % renewable energy output/year 177,869P0687 Renewable final energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy demand reduction capacity in public buildings 80606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Reducing final energy consumption in public buildings kWh/year 59 166P0689V capacity of electricity consumption of electricity consumption in public buildings 0.0606 power consumption in the building before the implementation of energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689null of electricity consumption capacity from public buildings 0.0606 electricity consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Renewable energy consumption reduction in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity 0.0606 renewable energy consumption in the building before implementing energy efficiency measures MWh/year 177,869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689 Renewable energy consumption capacity from public buildings 0.0606 Renewable energy needs 0.0606 Renewable energy needs 0.06 Renewable energy consumption 0.0806 Renewable energy production year 0.0869P0687 Reduction of final energy consumption in public buildings kWh/year 59 166P0689Emissions of public buildings (English)
    28 September 2021
    0 references