Reconstruction in front of the AURA school (Q3102351): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Created claim: summary (P836): The aim of the project is to create spatial and material-technical conditions for increasing the level of training of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy efficiency of the public building. In this way, the project not only creates conditions for raising the level of training of children in the city, but also promotes the development of the quality of educat...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to create spatial and material-technical conditions for increasing the level of training of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy efficiency of the public building. In this way, the project not only creates conditions for raising the level of training of children in the city, but also promotes the development of the quality of education and thus the improvement of the quality of life of the population. The first two activities of the project are built to create space conditions for increasing capacity (by 10 children, including the creation of 1 new class) through the construction and technical modifications of the existing building of the school and its outdoor area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time promote the sustainable provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of the building) is located in the.ú. Humenné. The founder of the school is the Civic Association AURA. Measurable indicators: number of refurbished buildings, areas, supported by secondary schools = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English) | |||||||||||||||
Property / summary: The aim of the project is to create spatial and material-technical conditions for increasing the level of training of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy efficiency of the public building. In this way, the project not only creates conditions for raising the level of training of children in the city, but also promotes the development of the quality of education and thus the improvement of the quality of life of the population. The first two activities of the project are built to create space conditions for increasing capacity (by 10 children, including the creation of 1 new class) through the construction and technical modifications of the existing building of the school and its outdoor area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time promote the sustainable provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of the building) is located in the.ú. Humenné. The founder of the school is the Civic Association AURA. Measurable indicators: number of refurbished buildings, areas, supported by secondary schools = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to create spatial and material-technical conditions for increasing the level of training of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy efficiency of the public building. In this way, the project not only creates conditions for raising the level of training of children in the city, but also promotes the development of the quality of education and thus the improvement of the quality of life of the population. The first two activities of the project are built to create space conditions for increasing capacity (by 10 children, including the creation of 1 new class) through the construction and technical modifications of the existing building of the school and its outdoor area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time promote the sustainable provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of the building) is located in the.ú. Humenné. The founder of the school is the Civic Association AURA. Measurable indicators: number of refurbished buildings, areas, supported by secondary schools = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English) / qualifier | |||||||||||||||
point in time: 28 September 2021
|
Revision as of 14:04, 28 September 2021
Project Q3102351 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction in front of the AURA school |
Project Q3102351 in Slovakia |
Statements
83,759.65 Euro
0 references
98,540.76 Euro
0 references
85.0 percent
0 references
1 July 2019
0 references
1 June 2020
0 references
Občianske združenie AURA
0 references
Cieľom projektu je vytvorenie priestorových a materiálno–technických podmienok pre zvýšenie úrovne zaškolenosti detí, celkové skvalitnenie výchovno-vzdelávacieho procesu s dôrazom na zvýšenie kapacity a zlepšenia energetickej hospodárnosti verejnej budovy. Projekt tak vytvára podmienky nielen pre zvýšenie úrovne zaškolenosti detí v meste, ale zároveň podporuje rozvoj kvality vzdelania a tým zlepšenie kvality života obyvateľov. Prvé dve aktivity projektu sú postavené tak aby prostredníctvom stavebno – technických úprav existujúceho objektu MŠ a jeho vonkajšieho areálu vytvorili priestorové podmienky pre navýšenie kapacity (o 10 detí vrátane vytvorenia 1 novej triedy). Treťou súvisiacou aktivitou sú stavebné úpravy prispievajúce k zvýšenie energetickej hospodárnosti. Prínosy projektu sú zamerané na deti v predškolskej výchove a zároveň podporujú udržateľné poskytovanie verejných služieb. Budova ktorá je predmetom projektu (stavebné úpravy a prístavba k stavbe č. súp. 5039, spojené so zmenou v užívaní stavby) sa nachádza v k.ú. Humenné. Zriaďovateľom školy je Občianske združenie AURA. Merateľné ukazovatele: počet renovovaných budov, areálov, podporených MŠ = 1, renovovaná podlahová plocha =. 551,11 m2, dosiahnutá kapacita zariadenia na úroveň 41 detí, zníženie ročnej spotreby primárnej energie vo verejných budovách - 28 038,32 kWh/rok. (Slovak)
0 references
The aim of the project is to create spatial and material-technical conditions for increasing the level of training of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy efficiency of the public building. In this way, the project not only creates conditions for raising the level of training of children in the city, but also promotes the development of the quality of education and thus the improvement of the quality of life of the population. The first two activities of the project are built to create space conditions for increasing capacity (by 10 children, including the creation of 1 new class) through the construction and technical modifications of the existing building of the school and its outdoor area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time promote the sustainable provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of the building) is located in the.ú. Humenné. The founder of the school is the Civic Association AURA. Measurable indicators: number of refurbished buildings, areas, supported by secondary schools = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English)
28 September 2021
0 references
Identifiers
302021M851
0 references