ENERGY UPGRADING OF DIONYSOS MUNICIPAL BUILDINGS (Q2821758): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in greece)
Property / co-financing rate
80.0 percent
Amount80.0 percent
Unitpercent
 
Property / co-financing rate: 80.0 percent / rank
Normal rank
 

Revision as of 17:38, 27 September 2021

Project Q2821758 in Greece
Language Label Description Also known as
English
ENERGY UPGRADING OF DIONYSOS MUNICIPAL BUILDINGS
Project Q2821758 in Greece

    Statements

    0 references
    212,431.0 Euro
    0 references
    15 May 2021
    0 references
    31 December 2022
    0 references
    ΔΗΜΟΣ ΔΙΟΝΥΣΟΥ
    0 references
    0 references

    38°3'38.27"N, 23°43'46.24"E
    0 references
    Το έργο αφορά στην ενεργειακή αναβάθμιση του Γυμνασίου ’νοιξης και του Γυμνασίου Δροσίας του Δήμου Διονύσου Αττικής με την υλοποίηση των παρακάτω παρεμβάσεων:Γυμνάσιο ’νοιξης•Αντικατάσταση των κουφωμάτων με νέα συστήματα χαμηλού συντελεστή θερμοπερατότητας•Παρεμβάσεις στο σύστημα θέρμανσης του κτιρίου (αλλαγή λέβητα, κυκλοφορητή και τοποθέτηση συστήματος αντιστάθμισης)•Αντικατάσταση συμβατικών λαμπτήρων με λαμπτήρες εξοικονόμησης (LED)Γυμνάσιο Δροσιάς•Αντικατάσταση των κουφωμάτων με νέα συστήματα χαμηλού συντελεστή θερμοπερατότητας•Τοποθέτηση συστήματος εξωτερικής θερμοπρόσοψης •Θερμομόνωση δώματος•Αντικατάσταση Λέβητα•Αντικατάσταση συμβατικών λαμπτήρων με λαμπτήρες εξοικονόμησης (LED)Με την εφαρμογή τα παραπάνω προτάσεων και τα δύο σχολεία θα αναβαθμιστούν κατά δύο ενεργειακές κατηγορίες, από Δ σε Β. (Greek)
    0 references
    The project concerns the energy upgrading of the Spring Gymnasium and the Drosia Gymnasium of the Municipality of Dionysos Attiki through the implementation of the following interventions: Spring GymnasiumReplacement of frames with new systems low heat permeabilityInterpretation of the heating system of the building (change of boiler, circulating and installation of compensation system)Replacement of conventional lamps with saving lamps (LED)Interpresory of the heating system of the building (change of boiler, circulator and installation of compensation system)Interpretation of conventional lamps with saving lamps (LED)Interpresement of the heating system of the building (change of boiler, circulator and installation of compensation system)Interpretation of conventional lamps with saving lamps (LED)Includation of the heating system of the building (change of boiler, circulator and installation of compensation system) (English)
    5 July 2021
    0 references

    Identifiers

    5.070.494
    0 references