Exchange of heat source and modernisation of the heating system of E.M. Šoltésová 27 (Q3107549): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying co-finance rate with the percentage)
(‎Removed claims)
Property / beneficiary name (string)
Mesto Spišská Nová Ves
 
Property / beneficiary name (string): Mesto Spišská Nová Ves / rank
Normal rank
 
Property / summary
Cieľom projektu  je  dosiahnutie vysoko účinnej, nízkouhlíkovej bezpečnej výroby tepla v objekte MŠ E. M. Šoltésovej v Spišskej Novej Vsi, zabezpečujúcej ochranu zdravia a životného prostredia a zníženia spotreby tepla a tepelnej energie aplikáciou  perspektívnych a inovatívnych technológií využívajúcich OZE. Cieľ projektu je vo vecnom súlade so Špecifickým cieľom Operačného programu Kvalita životného prostredia 4.1.1 Zvýšenie podielu OZE na hrubej konečnej energetickej spotrebe SR. Aktivity projektuProjekt bude realizovaný prostredníctvom jednej hlavnej aktivity s názvom Výstavba zariadení na využitie aerotermálnej, hydrotermálnej alebo geotermálnej energie s použitím tepelného čerpadla a na využitie slnečnej energie na výrobu tepla. Predmetom projektu je rekonštrukcia zdroja tepla pre vykurovanie a prípravu ohriatej pitnej vody v Materskej školy E. M. Šoltésovej v Spišskej Novej Vsi za účelom zníženia energetickej náročnosti, a tým zníženia produkovaných emisií zdroja tepla na vykurovanie a prípravu ohriatej pitnej vody. V súčasnosti je dodávka tepla pre nízkotlakové teplovodné vykurovanie budovy s teplotným spádom 90/70°C zabezpečovaná vlastnou kotolňou na zemný plyn prostredníctvom troch kotlov ÉTI - 75. Celkový inštalovaný výkon kotolne je 225 kW. V rámci predkladaného projektu  sú ako zdroj tepla navrhované tepelné čerpadlo IDM TERRA AL 60 MAX v kombinácií s plynovým kondenzačným kotlom ATAG a solárnym termickým systémom. Harmonogram realizácie projektuRealizácia hlavnej aktivity projektu bude uskutočnená počas 2 mesiacov, v období 07/2021 – 08/2021. Celková dĺžka realizácie projektu vrátane podporných aktivít je plánovaná na 10 mesiacov, v období 01/2021 - 10/2021. Miesto realizácie projektuProjekt bude realizovaný v katastrálnom území mesta Spišská Nová Ves, na pozemku C-KN 4766 , LV č. 1., ulica E. M. Šoltésovej 27, súpisné č. 2663.Vlastníkom budovy ako aj pozemku pod budovou je žiadateľ, Mesto Spišská Nová Ves. Merateľné ukazovatele projektuMerateľné ukazovatele projektu sú definované v časti 10. Očakávané merateľné ukazovatele, formulár ŽoNFP. (Slovak)
 
Property / summary: Cieľom projektu  je  dosiahnutie vysoko účinnej, nízkouhlíkovej bezpečnej výroby tepla v objekte MŠ E. M. Šoltésovej v Spišskej Novej Vsi, zabezpečujúcej ochranu zdravia a životného prostredia a zníženia spotreby tepla a tepelnej energie aplikáciou  perspektívnych a inovatívnych technológií využívajúcich OZE. Cieľ projektu je vo vecnom súlade so Špecifickým cieľom Operačného programu Kvalita životného prostredia 4.1.1 Zvýšenie podielu OZE na hrubej konečnej energetickej spotrebe SR. Aktivity projektuProjekt bude realizovaný prostredníctvom jednej hlavnej aktivity s názvom Výstavba zariadení na využitie aerotermálnej, hydrotermálnej alebo geotermálnej energie s použitím tepelného čerpadla a na využitie slnečnej energie na výrobu tepla. Predmetom projektu je rekonštrukcia zdroja tepla pre vykurovanie a prípravu ohriatej pitnej vody v Materskej školy E. M. Šoltésovej v Spišskej Novej Vsi za účelom zníženia energetickej náročnosti, a tým zníženia produkovaných emisií zdroja tepla na vykurovanie a prípravu ohriatej pitnej vody. V súčasnosti je dodávka tepla pre nízkotlakové teplovodné vykurovanie budovy s teplotným spádom 90/70°C zabezpečovaná vlastnou kotolňou na zemný plyn prostredníctvom troch kotlov ÉTI - 75. Celkový inštalovaný výkon kotolne je 225 kW. V rámci predkladaného projektu  sú ako zdroj tepla navrhované tepelné čerpadlo IDM TERRA AL 60 MAX v kombinácií s plynovým kondenzačným kotlom ATAG a solárnym termickým systémom. Harmonogram realizácie projektuRealizácia hlavnej aktivity projektu bude uskutočnená počas 2 mesiacov, v období 07/2021 – 08/2021. Celková dĺžka realizácie projektu vrátane podporných aktivít je plánovaná na 10 mesiacov, v období 01/2021 - 10/2021. Miesto realizácie projektuProjekt bude realizovaný v katastrálnom území mesta Spišská Nová Ves, na pozemku C-KN 4766 , LV č. 1., ulica E. M. Šoltésovej 27, súpisné č. 2663.Vlastníkom budovy ako aj pozemku pod budovou je žiadateľ, Mesto Spišská Nová Ves. Merateľné ukazovatele projektuMerateľné ukazovatele projektu sú definované v časti 10. Očakávané merateľné ukazovatele, formulár ŽoNFP. (Slovak) / rank
Normal rank
 
Property / summary
The aim of the project is to achieve high-efficiency, low-carbon, safe heat production in the MŠ E. M. Šoltésová building in Spišská Nová Ves, ensuring the protection of health and the environment and the reduction of heat and thermal energy consumption by applying forward-looking and innovative technologies using RES. The objective of the project is substantively in line with the Specific Objective of the Operational Programme Quality of the Environment 4.1.1 Increasing the share of RES in Slovakia’s gross final energy consumption. Project activities The project will be implemented through one main activity called Construction of equipment for the use of aerothermal, hydrothermal or geothermal energy using a heat pump and for the use of solar energy for heat generation. The subject of the project is the reconstruction of the heat source for heating and preparation of heated drinking water at the E. M. Šoltésová Materská School in Spišská Nová Ves in order to reduce the energy intensity and thus reduce the produced emissions of the heat source for heating and preparation of heated drinking water. Currently, the supply of heat for low-pressure hot water heating of a building with a temperature gradient of 90/70 °C is provided by its own natural gas boiler through three boilers Éti – 75. The total installed capacity of the boiler room is 225 kW. As a heat source, the IDM TERRA AL 60 MAX heat pump is designed as a heat source in combination with ATAG gas condensing boiler and solar thermal system. Project implementation scheduleThe implementation of the main activity of the project will be carried out within 2 months, in the period 07/2021-08/2021. The total duration of the project, including support activities, is planned for 10 months, in the period 01/2021-10/2021. The project will be implemented in the cadastral area of Spišská Nová Ves, on land C-KN 4766, LV No. 1., E. M. Šoltésová 27 street, inventory No. 2663. The owner of the building as well as the land under the building is the applicant, City of Spišská Nová Ves. Measurable project indicatorsThe measurable project indicators are defined in section 10. Expected measurable indicators, application form. (English)
 
Property / summary: The aim of the project is to achieve high-efficiency, low-carbon, safe heat production in the MŠ E. M. Šoltésová building in Spišská Nová Ves, ensuring the protection of health and the environment and the reduction of heat and thermal energy consumption by applying forward-looking and innovative technologies using RES. The objective of the project is substantively in line with the Specific Objective of the Operational Programme Quality of the Environment 4.1.1 Increasing the share of RES in Slovakia’s gross final energy consumption. Project activities The project will be implemented through one main activity called Construction of equipment for the use of aerothermal, hydrothermal or geothermal energy using a heat pump and for the use of solar energy for heat generation. The subject of the project is the reconstruction of the heat source for heating and preparation of heated drinking water at the E. M. Šoltésová Materská School in Spišská Nová Ves in order to reduce the energy intensity and thus reduce the produced emissions of the heat source for heating and preparation of heated drinking water. Currently, the supply of heat for low-pressure hot water heating of a building with a temperature gradient of 90/70 °C is provided by its own natural gas boiler through three boilers Éti – 75. The total installed capacity of the boiler room is 225 kW. As a heat source, the IDM TERRA AL 60 MAX heat pump is designed as a heat source in combination with ATAG gas condensing boiler and solar thermal system. Project implementation scheduleThe implementation of the main activity of the project will be carried out within 2 months, in the period 07/2021-08/2021. The total duration of the project, including support activities, is planned for 10 months, in the period 01/2021-10/2021. The project will be implemented in the cadastral area of Spišská Nová Ves, on land C-KN 4766, LV No. 1., E. M. Šoltésová 27 street, inventory No. 2663. The owner of the building as well as the land under the building is the applicant, City of Spišská Nová Ves. Measurable project indicatorsThe measurable project indicators are defined in section 10. Expected measurable indicators, application form. (English) / rank
Normal rank
 
Property / summary: The aim of the project is to achieve high-efficiency, low-carbon, safe heat production in the MŠ E. M. Šoltésová building in Spišská Nová Ves, ensuring the protection of health and the environment and the reduction of heat and thermal energy consumption by applying forward-looking and innovative technologies using RES. The objective of the project is substantively in line with the Specific Objective of the Operational Programme Quality of the Environment 4.1.1 Increasing the share of RES in Slovakia’s gross final energy consumption. Project activities The project will be implemented through one main activity called Construction of equipment for the use of aerothermal, hydrothermal or geothermal energy using a heat pump and for the use of solar energy for heat generation. The subject of the project is the reconstruction of the heat source for heating and preparation of heated drinking water at the E. M. Šoltésová Materská School in Spišská Nová Ves in order to reduce the energy intensity and thus reduce the produced emissions of the heat source for heating and preparation of heated drinking water. Currently, the supply of heat for low-pressure hot water heating of a building with a temperature gradient of 90/70 °C is provided by its own natural gas boiler through three boilers Éti – 75. The total installed capacity of the boiler room is 225 kW. As a heat source, the IDM TERRA AL 60 MAX heat pump is designed as a heat source in combination with ATAG gas condensing boiler and solar thermal system. Project implementation scheduleThe implementation of the main activity of the project will be carried out within 2 months, in the period 07/2021-08/2021. The total duration of the project, including support activities, is planned for 10 months, in the period 01/2021-10/2021. The project will be implemented in the cadastral area of Spišská Nová Ves, on land C-KN 4766, LV No. 1., E. M. Šoltésová 27 street, inventory No. 2663. The owner of the building as well as the land under the building is the applicant, City of Spišská Nová Ves. Measurable project indicatorsThe measurable project indicators are defined in section 10. Expected measurable indicators, application form. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 14:25, 27 September 2021

Project Q3107549 in Slovakia
Language Label Description Also known as
English
Exchange of heat source and modernisation of the heating system of E.M. Šoltésová 27
Project Q3107549 in Slovakia

    Statements

    0 references
    104,756.21 Euro
    0 references
    123,242.6 Euro
    0 references
    85.0 percent
    0 references
    1 January 2021
    0 references
    10 January 2021
    0 references
    Q3121810 (Deleted Item)
    0 references

    48°56'36.71"N, 20°34'4.73"E
    0 references

    Identifiers

    310041ALH2
    0 references