Reducing the energy intensity of the School Gymnasium Partizánske (Q3101699): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Property / beneficiary name (string)
Trenčiansky samosprávny kraj
 
Property / beneficiary name (string): Trenčiansky samosprávny kraj / rank
Normal rank
 
Property / summary
Projekt bude realizovaný na Gymnáziu, Komenského 2/1074, Partizánske a jeho hlavným ciežom je zlepšenie energetickej hospodárnosti objektov slúžiacich pre vzdelávacie potreby, ktorá bude dosiahnutá prostredníctvom stavebných úprav navrhnutých v energetickom audite. V rámci stavených prác bude vykonané zateplenie obvodového pl᚝a, výmena jestvujúcich okien za plastové a vchodových dverí za hliníkové. Strechy objektu budú zateplené a opatrené novou strešnou krytinou. Súčasou obnovy striech je aj nové oplechovanie a odkvapový systém. Súčasou opatrení na zníženie energetickej náročnosti je inštalácia núteného vetrania so spätným získavaním tepla v učebniach a telocvični, hydraulické vyregulovanie, inštalácia tepelného čerpadla na ohrev TV pre účely telocvične a výmena osvesžovacej sústavy vo vybraných priestoroch.Súčasou projektu sú aj drobné súvisiace stavebné práce ako napr. úprava bleskozvodov a dažďových zvodov, dokončovacie práce, mažovka a pod. Realizáciou projektu sa dosiahne zlepšenie vnútorného prostredia školy pre študentov, pedagogický a nepedagogický personál školy a úspora prevádzkových nákladov. Znížením spotreby energií sa zníži aj produkcia znečisujúcich látok, čo bude ma pozitívny vplyv na životné prostredie. (Slovak)
 
Property / summary: Projekt bude realizovaný na Gymnáziu, Komenského 2/1074, Partizánske a jeho hlavným ciežom je zlepšenie energetickej hospodárnosti objektov slúžiacich pre vzdelávacie potreby, ktorá bude dosiahnutá prostredníctvom stavebných úprav navrhnutých v energetickom audite. V rámci stavených prác bude vykonané zateplenie obvodového pl᚝a, výmena jestvujúcich okien za plastové a vchodových dverí za hliníkové. Strechy objektu budú zateplené a opatrené novou strešnou krytinou. Súčasou obnovy striech je aj nové oplechovanie a odkvapový systém. Súčasou opatrení na zníženie energetickej náročnosti je inštalácia núteného vetrania so spätným získavaním tepla v učebniach a telocvični, hydraulické vyregulovanie, inštalácia tepelného čerpadla na ohrev TV pre účely telocvične a výmena osvesžovacej sústavy vo vybraných priestoroch.Súčasou projektu sú aj drobné súvisiace stavebné práce ako napr. úprava bleskozvodov a dažďových zvodov, dokončovacie práce, mažovka a pod. Realizáciou projektu sa dosiahne zlepšenie vnútorného prostredia školy pre študentov, pedagogický a nepedagogický personál školy a úspora prevádzkových nákladov. Znížením spotreby energií sa zníži aj produkcia znečisujúcich látok, čo bude ma pozitívny vplyv na životné prostredie. (Slovak) / rank
Normal rank
 
Property / summary
The project will be implemented at the Gymnasium, Comenius 2/1074, Partizánske and its main objective is to improve the energy performance of objects serving educational needs, which will be achieved through building modifications designed in the energy audit. As part of the construction works will be carried out insulation of the perimeter beach, replacement of existing windows for plastic and entrance doors for aluminum. The roofs of the building will be insulated and provided with new strut roofing. At the moment of roof restoration is also a new sheeting and guttering system. Part of the measures to reduce energy intensity is Installation of forced ventilation with heat recovery in classrooms and gyms, hydraulic regulation, Installation of heat pump to heat TV for the purposes of gymnasium and replacement of the hanging system in selected areas.The project also includes small related construction works such as adjustment of lightning conductors and rain leads, finishing works, grease, etc. The implementation of the project will achieve improvement of the inner environment of the round for students, pedagogical and non-teaching staff and savings in operating costs. Reducing energy consumption will also reduce the production of polluting substances, which will have a positive impact on the environment. (English)
 
Property / summary: The project will be implemented at the Gymnasium, Comenius 2/1074, Partizánske and its main objective is to improve the energy performance of objects serving educational needs, which will be achieved through building modifications designed in the energy audit. As part of the construction works will be carried out insulation of the perimeter beach, replacement of existing windows for plastic and entrance doors for aluminum. The roofs of the building will be insulated and provided with new strut roofing. At the moment of roof restoration is also a new sheeting and guttering system. Part of the measures to reduce energy intensity is Installation of forced ventilation with heat recovery in classrooms and gyms, hydraulic regulation, Installation of heat pump to heat TV for the purposes of gymnasium and replacement of the hanging system in selected areas.The project also includes small related construction works such as adjustment of lightning conductors and rain leads, finishing works, grease, etc. The implementation of the project will achieve improvement of the inner environment of the round for students, pedagogical and non-teaching staff and savings in operating costs. Reducing energy consumption will also reduce the production of polluting substances, which will have a positive impact on the environment. (English) / rank
Normal rank
 
Property / summary: The project will be implemented at the Gymnasium, Comenius 2/1074, Partizánske and its main objective is to improve the energy performance of objects serving educational needs, which will be achieved through building modifications designed in the energy audit. As part of the construction works will be carried out insulation of the perimeter beach, replacement of existing windows for plastic and entrance doors for aluminum. The roofs of the building will be insulated and provided with new strut roofing. At the moment of roof restoration is also a new sheeting and guttering system. Part of the measures to reduce energy intensity is Installation of forced ventilation with heat recovery in classrooms and gyms, hydraulic regulation, Installation of heat pump to heat TV for the purposes of gymnasium and replacement of the hanging system in selected areas.The project also includes small related construction works such as adjustment of lightning conductors and rain leads, finishing works, grease, etc. The implementation of the project will achieve improvement of the inner environment of the round for students, pedagogical and non-teaching staff and savings in operating costs. Reducing energy consumption will also reduce the production of polluting substances, which will have a positive impact on the environment. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 12:21, 27 September 2021

Project Q3101699 in Slovakia
Language Label Description Also known as
English
Reducing the energy intensity of the School Gymnasium Partizánske
Project Q3101699 in Slovakia

    Statements

    0 references
    889,334.05 Euro
    0 references
    1,046,275.35 Euro
    0 references
    0.85 percent
    0 references
    1 March 2016
    0 references
    1 August 2020
    0 references
    0 references

    48°52'24.74"N, 18°2'33.43"E
    0 references

    Identifiers

    310041G729
    0 references