Reducing the energy intensity of the public building – House of Culture with Súp. No. 467 (Q3110726): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3121473 / rank | |||
Normal rank |
Revision as of 23:01, 23 September 2021
Project Q3110726 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the public building – House of Culture with Súp. No. 467 |
Project Q3110726 in Slovakia |
Statements
174,065.52 Euro
0 references
204,782.96 Euro
0 references
0.85 percent
0 references
4 January 2017
0 references
7 January 2020
0 references
Obec Lietavská Lúčka
0 references
Zateplenie obvodového plášťa bude realizované kontaktným zateplovacím systémom ETICS. Zatepļovací systém bude tvoriť kombinácia vybraných materiálov z hļadiska tepelnéRiešené časti strechy z hļadiska tepelno-technického ako aj z hļadiska odolnosti voči poveternostným vplyvom na základe hodnotení Energetického Auditu neplní svoju funkciu. Klampiarske oplechovanie a atikové oplechovania budú odstránené. Navrhnuté je kompletné odstránenie všetkých vrstiev strešného plášťa aţ po nosnú konštrukciu panel PZD, na ktoré bude uloţená nová skladba vrátane spádovej vrstvy.Pôvodné otvorové konštrukcie – drevené okná a dvere boli roku 2000 nahradené novými plastovými otvorovými konštrukciami s izolačným dvojsklom. Vzhļadom na to, že od tejto čiastočnej rekonštrukcie uplynulo 17 rokov a s ohļadom na súčasný stupeň netesnosti a jestvujúcich otvorových konštrukcií, opotrebovania kovaní a tesnení rámov je ich výmena nevyhnutná. navrhuje sa výmena za plastové okná a dvere s presklením izolačným trojsklom.V projekte sú navrhnuté odstránenie všetkých výplní s výnimkou dvojice presklených stien v zádverí. Navrhnutá je výmena za plastové okná s izolačným trojsklom s rovnakým otváraním a delením. Z titulu zateplenia budovy došlo k zmene rozmeru okien na východnej strane na 1.NP.Navrhnutá skladba strechy zodpovedá poţadovaným tepelnoizolačným požiadavkám, navrhnutá krytina zaručuje dokonalú tesnosť povrchu. Vrstvy strešného plášťa budú k podkladu kotvené mechaniky prostredníctvom teleskopických kotiev. Podļa hodnotení energetického auditu je dvojíca plynových kotlov s celkovým výkonom 96 kW technický zastaraná a vykazuje vysoký stupeň amortizácie. Táto zostava kotlov bude vymenená za 2 kotle 2x 35 kW. Bude vykonané hydraulické vyregulovanie na ústrednom kúrení so znížením teplotného spádu. Detailné parametre rieši projekt vykurovania.Budova má vyriešený bezbariérový prístup. (Slovak)
0 references
Insulation of the outer casing will be realised by contact insulation system ETICS. The insulation system will consist of a combination of selected materials from the thermal solution parts of the roof from the thermal and technical as well as from the weather resistance point based on Energy Audit does not fulfil its function. Plumbing and attic plates will be removed. It is designed to completely remove all layers of the roof covering up to the supporting structure of the PZD panel, on which a new composition will be placed, including the catchment layer.The original opening structures – wooden windows and doors were replaced by new plastic open structures with double glazing insulation in 2000. Due to the fact that 17 years have passed since this partial reconstruction and due to the current degree of leakage and existing opening structures, forging and sealing of the frames, their replacement is necessary. It is proposed to replace the plastic windows and doors with glazing triple glazing. In the project, the removal of all fillings are proposed, except for a pair of glazed walls in the vestibule. It is designed to replace plastic windows with insulating triple glazing with the same opening and division. Due to the insulation of the building there has been a change in the size of the windows on the east side on the 1st floor.The proposed composition of the roof corresponds to the required thermal insulation requirements, the design of the roof ensures perfect surface tightness. Layers of roofing will be anchored to the base of the mechanics through telescopic anchors. The evaluation of energy audit is a double gas boiler with a total output of 96 kW technical outdated and shows a high degree of amortisation. This boiler assembly will be exchanged for 2 boilers 2x 35 kW. Hydraulic control on central heating with reduction of temperature gradient will be performed. Detailed parameters are solved by the heating project.The building has solved barrier-free access. (English)
15 September 2021
0 references