Measures to increase traffic capacity on DN 1 – Prahova Valley, Comarnic – Predeal road sector (Q3099252): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Compania Națională de Administrare a Infrastructurii Rutiere / rank
 
Normal rank

Revision as of 16:36, 23 September 2021

Project Q3099252 in Romania
Language Label Description Also known as
English
Measures to increase traffic capacity on DN 1 – Prahova Valley, Comarnic – Predeal road sector
Project Q3099252 in Romania

    Statements

    0 references
    2,629,998.54 Romanian Leu
    0 references
    525,999.708 Euro
    13 September 2021
    0 references
    3,094,115.91 Romanian Leu
    0 references
    618,823.182 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 January 2021
    0 references
    31 July 2022
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    Obiectivul general al proiectului este de a spori eficienta economica a retelei de transport din Romania. Obiectivul operational specific este de a aduce imbunatatiri in ceea ce priveste viteza de calatorie intre Comarnic si Predeal, prin descongestionarea traficului pe ruta existenta (DN1), imbunatatind astfel si conectivitatea la nivel regional. Prezentul proiect are in vedere elaborarea Studiului de Fezabilitate si a Proiectului Tehnic de Executie pentru 6 Obiective de investitie aflate de-a lungul drumului national DN1 – Valea Prahovei in zona Comarnic – Predeal, dupa cum urmeaza: • Obiectivul 1: Amenajare pasaj pietonal subteran / suprateran – Piata Centrala din Comarnic intersectie DN 1 cu str. Ghiosesti si amenajare pasaj pietonal subteran / suprateran Primaria Comarnic; • Obiectivul 2: Amenajare pasaj pietonal subteran / suprateran – intersectie DN1 cu Str. Crinului (Poiana Tapului), Str. Telecabinei (Busteni) si Str. Panduri (Predeal); • Obiectivul 3: Realizare pasaj rutier la intersectia DN1 cu Str. Prahovei (Azuga); • Obiectivul 4: Realizare pasaj rutier la intersectia DN1 cu DN73A (Predeal) – Obiectivul 4; • Obiectivul 5: Realizare pasaj rutier la intersectia DN1 cu Bulevardul Republicii (Sinaia Sud); • Obiectivul 6: Realizare Pasaj rutier la intersectia DN1 cu Bulevardul Ferdinand (Sinaia Nord). Realizarea acestui proiect – etapa de proiectare pentru identificarea măsurilor de sporire a capacității de circulație pe DN 1 – Valea Prahovei – sectorul de drum Comarnic – Predeal contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la AM POIM / Organismul Intermediar pentru Transport. (Romanian)
    0 references
    The general objective of the project is to increase the economic efficiency of the transport network in Romania. The specific operational objective is to bring improvements in travel speed between Comarnic and Predeal, by decongesting traffic on the existing route (DN1), thus also improving connectivity at regional level. The present project envisages the elaboration of the Feasibility Study and the Technical Implementation Project for 6 Investment Objectives along the National Road DN1 – Valea Prahovei in the Comarnic – Predeal area, as follows: • Objective 1: Arrangement of underground/overground pedestrian passage – Central Square in Comarnic intersection DN 1 with str. Ghiosesti and arrangement of the underground/superterran pedestrian passage Comarnic Mayor’s Office; • Objective 2: Arrangement of underground/overground pedestrian passage – intersection DN1 with Str. Lily (Poiana Tapului), Str. Cable car (Busteni) and Str. Panduri (Predeal); • Objective 3: Road crossing at the intersection of DN1 and Str. Prahova (Azuga); • Objective 4: Road crossing at the intersection of DN1 with DN73A (Predeal) – Objective 4; • Objective 5: Road crossing at the intersection of DN1 with the Republic Boulevard (Sinaia Sud); • Objective 6: Road crossing at the intersection of DN1 with Ferdinand Boulevard (Sinaia Nord). The implementation of this project – the design phase to identify measures to increase traffic capacity on DN 1 – Prahova Valley – Comarnic – Predeal road sector contributes to the result indicator 2S81 – Grant application submitted for analysis and approval to MA LIOP/Intermediate Body for Transport. (English)
    16 September 2021
    0 references
    Oraş Predeal, Romania
    0 references
    Oraş Sinaia, Romania
    0 references
    Oraş Comarnic, Romania
    0 references
    Oraş Azuga, Romania
    0 references

    Identifiers

    139645
    0 references