USE OF RENEWABLE ENERGY IN GENERAL HOSPITAL IN HIGH MASOVIA AND CARE AND TREATMENT FACILITY IN CIECHANOWIEC (Q2711164): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: EU contribution (P835): 344,675.56 euro) |
(Changed claim: budget (P474): 459,567.43 euro) |
||
Property / budget: 459,567.43 Euro / rank | Property / budget: 459,567.43 Euro / rank | ||
Preferred rank |
Revision as of 21:56, 21 September 2021
Project Q2711164 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | USE OF RENEWABLE ENERGY IN GENERAL HOSPITAL IN HIGH MASOVIA AND CARE AND TREATMENT FACILITY IN CIECHANOWIEC |
Project Q2711164 in Poland |
Statements
1,550,497.36 zloty
0 references
2,067,329.88 zloty
0 references
75.0 percent
0 references
19 June 2019
0 references
28 December 2020
0 references
SZPITAL OGÓLNY W WYSOKIEM MAZOWIECKIEM
0 references
Przedsięwzięcie planowane do realizacji obejmuje wykonanie instalacji fotowoltaicznej na potrzeby Szpitala Ogólnego w Wysokiem Mazowieckiem, a także gruntowej pompy ciepła dostarczającej energię na potrzeby należącego do niego Zakładu Opiekuńczo-Leczniczego w Ciechanowcu. W Wysokiem Mazowieckiem przewiduje się wybudowanie trzech elektrowni PV podłączonych do trzech różnych punktów przyłączeniowych: • o mocy 47,74 kWp zlokalizowanej na dachu budynku głównego Szpitala, • o mocy 30,07 kWp znajdującej się na dachu budynku administracyjnego, • o mocy 99,2 kWp wykonanej na gruncie. Łączna moc instalacji fotowoltaicznych wyniesie zatem 177,01 kWp. Jeśli chodzi o komponent przedsięwzięcia przewidziany w Ciechanowcu, zaplanowano montaż dwusprężarkowej gruntowej pompy ciepła o mocy 134,6 kW (przy parametrach B0/W35°C różnica 5 K wg EN 14511). Zakłada się, że źródło to pokryje ok. 90% zapotrzebowania na ciepło budynków. Pozostałe 10% potrzebnej energii będzie pochodziło z kotła olejowego o mocy 129 kW, który będzie stanowił rezerwowe/awaryjne źródło ciepła. (Polish)
0 references
The project to be implemented includes the execution of a photovoltaic installation for the needs of the General Hospital in High Mazowiecki, as well as a ground heat pump supplying energy for the needs of its own care and treatment plant in Ciechanowiec. In High Mazowiecki, three PV power plants connected to three different connection points are planned: • with a capacity of 47.74 kWp located on the roof of the main building of the Hospital, • with a capacity of 30.07 kWp located on the roof of the administrative building, • with a capacity of 99.2 kWp made on the ground. The total capacity of the photovoltaic installations will therefore be 177.01 kWp. As regards the project component foreseen in Ciechanowiec, the installation of a double-compressor ground heat pump with a power of 134.6 kW is planned (with parameters B0/W35 °C a difference of 5 K according to EN 14511). It is assumed that the source will cover approx. 90 % of the heat demand of buildings. The remaining 10 % of the energy needed will come from a 129 kW oil boiler, which will be a backup/emergency heat source. (English)
8 July 2021
0 references
Identifiers
RPPD.05.01.00-20-0567/19
0 references