Reducing low emissions and increasing energy efficiency by replacing heat sources and thermomodernising buildings in the City and Municipality of Pilawa (Q2708149): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed claim: EU contribution (P835): 333,450.0 euro)
(‎Changed claim: budget (P474): 416,812.5 euro)
Property / budget: 416,812.5 Euro / rankProperty / budget: 416,812.5 Euro / rank
Normal rank
Preferred rank

Revision as of 21:53, 21 September 2021

Project Q2708149 in Poland
Language Label Description Also known as
English
Reducing low emissions and increasing energy efficiency by replacing heat sources and thermomodernising buildings in the City and Municipality of Pilawa
Project Q2708149 in Poland

    Statements

    0 references
    1,500,000.0 zloty
    0 references
    333,450.0 Euro
    0.2223 Euro
    0 references
    1,875,000.0 zloty
    0 references
    416,812.5 Euro
    0.2223 Euro
    0 references
    80.0 percent
    0 references
    1 October 2019
    0 references
    31 December 2022
    0 references
    MIASTO I GMINA PILAWA
    0 references
    0 references

    51°57'34.2"N, 21°31'37.9"E
    0 references
    Założeniem i głównym celem projektu jest likwidacja emisji powierzchniowej (tzw. niskiej emisji), pochodzącej z indywidualnych palenisk domowych i budynków użyteczności publicznej o 164,73 ton równoważnika CO2/rocznie i 0,72 ton PM10/rocznie (0,14%) oraz zwiększenie efektywności energetycznej budynków stanowiących kompleks szkolny i 1 budynku jednorodzinnego dla poprawy stanu środowiska w Mieście i Gminie Pilawa, w województwie mazowieckim. Cel projektu zostanie osiągnięty poprzez wymianę kotła węglowego na kocioł gazowy – 1 szt. (w budynku jednorodzinnym) oraz instalację absorpcyjnych, powietrznych pomp ciepła w kotłowni zasilającej budynki szkolne oraz termomodernizację energetyczną tych budynków. Projekt został także ujęty w PGN jako zadanie Poprawa efektywności energetycznej szkoły podstawowej, gimnazjum i hali sportowej w Pilawie, rozdział 5.4.4.Projekt uwzględnia odnawialne źródła energii w postaci pomp ciepła dla produkcji energii cieplnej. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 2 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych – 0,246 MWt. Projekt zawiera się w zakresie projektów podstawowych objętych Programem Rewitalizacji Gminy Pilawa - zadanie: „Termomodernizacja Publicznej Szkoły Podstawowej i Gimnazjum w Pilawie i zagospodarowanie terenu wokół placówki” – s. 196. LPR został wpisany do Wykazu programów rewitalizacji województwa mazowieckiego 27 czerwca 2017 r. Efektywność kosztowa: = 71,22 euro/m2. Projekt realizowany jest na obszarze, na którym planowane jest opracowanie programu wsparcia dla najuboższych osób, które w wyniku realizacji projektu będą ponosić zwiększone koszty grzewcze lokalu związane z trwałą zmianą sytemu ogrzewania. W ramach projektu ponoszone będą także koszty inspektora nadzoru oraz promocji projektu. Projekt realizowany będzie w formule "zaprojektuj i wybuduj". Na potrzeby realizacji inwestycji opracowano PFU, świadectwa energ., audyty i studium wykonalności. (Polish)
    0 references
    The aim and main objective of the project is to eliminate surface emissions (so-called low emissions) from individual domestic furnaces and public buildings by 164.33 tonnes of CO2/annual equivalent and 0.72 tonnes of PM10/year (0.14 %) and to increase the energy efficiency of the buildings constituting a school complex and 1 single-family building to improve the environment in the City and Municipality of Pilawa, in the Mazowieckie Voivodeship. The objective of the project will be achieved by replacing the coal boiler with a gas boiler – 1 piece. (in a single-family building) and installation of absorption, air heat pumps in the boiler room supplying school buildings and energy renovation of these buildings. The project was also included in PGN as the task of improving the energy efficiency of primary school, gymnasium and sports hall in Pilava, chapter 5.4.4.The project includes renewable energy sources in the form of heat pumps for the production of heat energy. Number of RES heat generation units built – 2 pcs. Additional renewable heat generation capacity – 0.246 MWt. The project includes basic projects covered by the Pilawa Municipality Revitalisation Programme – task: “Thermommodernisation of the Public Primary School and Gymnasium in Pilava and land development around the facility” – p. 196. LPR was entered in the List of revitalisation programmes of Mazowieckie voivodship on 27 June 2017. Cost efficiency: = EUR 71,22/m². The project is implemented in an area where it is planned to develop a support programme for the poorest people who, as a result of the implementation of the project, will bear the increased heating costs of the premises associated with the permanent change of the heating system. The project will also cover the costs of the supervision inspector and the project promotion. The project will be implemented in the formula “design and build”. PFUs, energy certificates, audits and feasibility studies were developed for the investment. (English)
    7 July 2021
    0 references

    Identifiers

    RPMA.04.03.01-14-D282/19
    0 references