Eco-Energy for the Municipality of Stanin – stage IV (Q2705770): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed claim: EU contribution (P835): 556,898.62 euro)
(‎Changed claim: budget (P474): 655,174.85 euro)
Property / budget: 655,174.85 Euro / rankProperty / budget: 655,174.85 Euro / rank
Normal rank
Preferred rank

Revision as of 19:56, 21 September 2021

Project Q2705770 in Poland
Language Label Description Also known as
English
Eco-Energy for the Municipality of Stanin – stage IV
Project Q2705770 in Poland

    Statements

    0 references
    2,505,166.97 zloty
    0 references
    556,898.62 Euro
    0.2223 Euro
    0 references
    2,947,255.27 zloty
    0 references
    655,174.85 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    14 August 2019
    0 references
    31 December 2023
    0 references
    GMINA STANIN
    0 references
    Q2523455 (Deleted Item)
    0 references

    51°52'17.0"N, 22°11'51.7"E
    0 references
    Przedmiotem projektu jest zakup i montaż Odnawialnych źródeł energii. Typy i moce: instalacje solarne 144 szt o łącznej mocy mocy 0,6 MW,; pompy ciepła.-19 szt o łącznej mocy 0,05 MW, kotły na biomasę 38 szt o łącznej mocy 0,76 MW, panele fotowoltaiczne.130 szt. o łącznej mocy 0,39 MW. Łączną moc zainstalowanych instalacji to 1,8 MW Potrzebą jest zwiększenie udziału OZE w bilansie paliwowo-energetycznym na terenie gminy. Jakość powietrza w gminie jest dobra. Dla gminy nie ma obowiązku opracowania programu ochrony powietrza. W POP dla strefy lubelskiej (do której należy gmina Stanin) nie wskazano działań naprawczych ani krótkoterminowych dla gminy, co oznacza że na jej terenie nie odnotowano przekroczenia poziomów substancji podlegających ocenie jakości powietrza. Problemem jest niska świadomość mieszkańców o ograniczonych zasobach nieodnawialnych surowców energetycznych i wykorzystaniu OZE. Zakres projektu: 1.montaż instalacji OZE (panele solarne, pompy ciepła i kotły na biomasę) w budynkach mieszkalnych ; 2.portal internetowy (serwis do transakcji on-line zapewniający szybkie kontakty z użytkownikami instalacji); 3.aplikacja na urządzenia mobilne(w celu edukacji energetycznej i ekologicznej mieszkańców oraz promocji OZE.Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30) 1,80 MW, Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE - 1149,23, Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE - 352,58. Szacowany spadek CO2 - 675,78 t/rok.Kolektory słoneczne - dach (VAT 8%) - 116szt.,Kolektory słoneczne - grunt (VAT 23%) -28szt.Instalacje fotowoltaiczne - dach 117 szt. Instalacje fotowoltaiczne - grunt -13szt. (Polish)
    0 references
    The subject of the project is the purchase and installation of Renewable Energy Sources. Types and Powers: solar installations 144 units with a total capacity of 0.6 MW; heat pumps.-19 units with a total capacity of 0.05 MW, biomass boilers 38 pcs with a total power of 0.76 MW, photovoltaic panels.130 units with a total capacity of 0.39 MW. The total capacity of installed installations is 1.8 MW The need is to increase the share of RES in the fuel and energy balance in the municipality. The air quality in the municipality is good. There is no obligation for the municipality to draw up an air quality programme. The POP for the Lublin zone (to which the municipality of Stanin belongs) does not indicate any corrective or short-term actions for the municipality, which means that there were no exceedances of the levels of substances subject to an air quality assessment. The problem is the low awareness of residents about the limited resources of non-renewable energy resources and the use of RES. Scope of the project: 1.installation of RES installations (solar panels, heat pumps and biomass boilers) in residential buildings; 2.Internet portal (online transaction service providing quick contacts with installation users); 3.Application for mobile devices(for the purpose of energy and environmental education of residents and promotion of RES.Additional capacity to generate energy from renewable sources (CI30) 1.80 MW, Production of thermal energy from newly built installations using RES – 1149.23, Production of electricity from newly built installations using RES – 352,58. Estimated decrease in CO2-675.78 t/year.Solar collectors – roof (VAT 8 %) – 116pcs,Solar collectors – land (VAT 23 %) -28pcs.Photovoltaic installations – roof 117 pcs. Photovoltaic installations – ground -13pcs. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.04.01.00-06-0048/19
    0 references