Q3098814 (Q3098814): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en)
(‎Created claim: summary (P836): The general objective is to support the economic growth in Romania by improving the road infrastructure and thus to improve the life and environmental conditions of the citizens in the localities adjacent to the connecting road and the conditions of goods traffic that will ensure quick access to the A1 and DN7 motorways (Titu municipality), with the financial support of the European Commission from Non-Reimbursable Foreign Funds. Implementation...)
Property / summary
 
The general objective is to support the economic growth in Romania by improving the road infrastructure and thus to improve the life and environmental conditions of the citizens in the localities adjacent to the connecting road and the conditions of goods traffic that will ensure quick access to the A1 and DN7 motorways (Titu municipality), with the financial support of the European Commission from Non-Reimbursable Foreign Funds. Implementation of the present project – Phase review/updating Feasibility Study and elaboration of Technical Project for “Connecting route between A1 and DN 7 (DJ 711 A) – Lengthening to 4 lanes” contributes to the result indicator 2S81 – Grant application submitted for analysis and approval to AMPOIM/ITO. (English)
Property / summary: The general objective is to support the economic growth in Romania by improving the road infrastructure and thus to improve the life and environmental conditions of the citizens in the localities adjacent to the connecting road and the conditions of goods traffic that will ensure quick access to the A1 and DN7 motorways (Titu municipality), with the financial support of the European Commission from Non-Reimbursable Foreign Funds. Implementation of the present project – Phase review/updating Feasibility Study and elaboration of Technical Project for “Connecting route between A1 and DN 7 (DJ 711 A) – Lengthening to 4 lanes” contributes to the result indicator 2S81 – Grant application submitted for analysis and approval to AMPOIM/ITO. (English) / rank
 
Normal rank
Property / summary: The general objective is to support the economic growth in Romania by improving the road infrastructure and thus to improve the life and environmental conditions of the citizens in the localities adjacent to the connecting road and the conditions of goods traffic that will ensure quick access to the A1 and DN7 motorways (Titu municipality), with the financial support of the European Commission from Non-Reimbursable Foreign Funds. Implementation of the present project – Phase review/updating Feasibility Study and elaboration of Technical Project for “Connecting route between A1 and DN 7 (DJ 711 A) – Lengthening to 4 lanes” contributes to the result indicator 2S81 – Grant application submitted for analysis and approval to AMPOIM/ITO. (English) / qualifier
 
point in time: 16 September 2021
Timestamp+2021-09-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:46, 16 September 2021

Project Q3098814 in Romania
Language Label Description Also known as
English
No label defined
Project Q3098814 in Romania

    Statements

    0 references
    919,430.32 Romanian Leu
    0 references
    183,886.064 Euro
    13 September 2021
    0 references
    1,081,682.73 Romanian Leu
    0 references
    216,336.546 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    31 August 2019
    0 references
    31 August 2021
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    Obiectivul general este de a sprijini cresterea economica in Romania prin imbunatatirea infrastructurii rutiere si implicit de a imbunatati viata si conditiile de mediu ale cetatenilor din localitatile adiacente drumului de legatura si a conditiilor traficului de marfuri ce va asigura acces rapid la autostrada A1 si DN7 (localitatea Titu), cu sprijinul financiar al Comisiei Europene din Fonduri Externe Nerambursabile. Realizarea prezentului proiect - faza revizuire/actualizare Studiu de Fezabilitate si elaborare Proiect Tehnic pentru “Drum de legătură între A1 şi DN 7 (DJ 711 A) - Largire la 4 benzi de circulatie” contribuie la indicatorul de rezultat 2S81 - Cerere de finanțare transmisă, spre analiză și aprobare la AMPOIM/OIT. (Romanian)
    0 references
    The general objective is to support the economic growth in Romania by improving the road infrastructure and thus to improve the life and environmental conditions of the citizens in the localities adjacent to the connecting road and the conditions of goods traffic that will ensure quick access to the A1 and DN7 motorways (Titu municipality), with the financial support of the European Commission from Non-Reimbursable Foreign Funds. Implementation of the present project – Phase review/updating Feasibility Study and elaboration of Technical Project for “Connecting route between A1 and DN 7 (DJ 711 A) – Lengthening to 4 lanes” contributes to the result indicator 2S81 – Grant application submitted for analysis and approval to AMPOIM/ITO. (English)
    16 September 2021
    0 references
    Oraş Titu, Romania
    0 references
    Judeţul Giurgiu, Romania
    0 references

    Identifiers

    128724
    0 references