The Establishment of the Parental School of St. Maximilian Maria Kolbe (Q3109064): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Košice Region / rank
 
Normal rank

Revision as of 01:02, 16 September 2021

Project Q3109064 in Slovakia
Language Label Description Also known as
English
The Establishment of the Parental School of St. Maximilian Maria Kolbe
Project Q3109064 in Slovakia

    Statements

    0 references
    108,205.0 Euro
    0 references
    127,300.0 Euro
    0 references
    0.85 percent
    0 references
    12 January 2017
    0 references
    12 January 2019
    0 references
    Spišská katolícka charita
    0 references

    48°56'36.71"N, 20°34'4.73"E
    0 references
    Projekt „Zriadenie materskej školy sv. Maximiliána Mária Kolbeho“ je zameraný na zriadenie MŠ s kapacitou 19 miest. Projekt nadväzuje na skúsenosti zriaďovateľa so vzdelávaním detí so zdravotným znevýhodnením. Reaguje na požiadavky rodičov, ktoré chcú svojim deťom zabezpečiť primerané vzdelanie. MŠ bude mať po zriadení a zaradení do siete škôl štatút školy zabezpečujúcej výchovu a vzdelávanie zdravých detí a detí so zdravotným znevýhodnením.Ciele projektu sú:ŠC 1: Zvýšením kapacít materských škôl  prispieť k zvýšeniu hrubej zaškolenosti detí predškolského veku,ŠC 2: vo významnej miere prispieť k zosúladenie súkromného a pracovného života rodičov, najmä rodičov  detí so zdravotným znevýhodnením,ŠC 3: znížiť energetickú náročnosť budovy MŠ,ŠC 4: Osadením herných prvkov prispieť k fyzickej zdatnosti detíŠC 5: vytvoriť dobré materiálno technické podmienky pre inkluzívne vzdelávanie,Aktivity projektu:1. Rekonštrukcia traktu „C“ budovy pre účely zriadenia materskej školy.2. Zníženie energetickej náročnosti budovy.3. Vytvorenie detského ihriska MŠ SMMK.4. Zabezpečenie materiálno-technického vybavenia MŠ SMMK.Informácia o merateľných ukazovateľoch:Vzhľadom na zameranie MŠ budú priestory a vzdelávací proces spĺňať všetky požiadavky inkluzívneho vzdelávania. Vytvorí sa 19 miest pre predprimárne vzdelávanie v modernej plne bezbariérovej budove, revitalizovaný vonkajší areál s atraktívnymi hernými prvkami, bude  zrenovovaných 154 m2 budovy  a znížená ročná spotreba primárnej energie o 27 655  kWh za rok, odhadované ročné zníženie emisií skleníkových plynov CO2 o 5,63 t. (Slovak)
    0 references
    Project "Establishment of a kindergarten sv. Maximilian Mário Kolbeho" focuses on the establishment of a school with a capacity of 19 seats. The project builds on the experience of the founder with the education of children with health disadvantages. It responds to the demands of parents who want to provide their children with adequate education. Following the establishment and inclusion in the network of schools, the MŠ will have the status of a school providing education for healthy children and children with disabilities. The objectives of the project are:ŠC 1: By increasing the capacity of kindergartens to contribute to increasing the gross induction of pre-school children, MS 2: to make a significant contribution to reconciling the private and working life of parents, especially parents of children with disabilities,SC 3: reduce the energy intensity of the MES building,ŠC 4: By installing game elements to contribute to the physical fitness of childrenŠC 5: create good material technical conditions for inclusive education,Project activities:1. Reconstruction of the tract “C” of the building for the purpose of establishing a kindergarten.2. Reducing the energy intensity of the building.3. Creating a children’s playground MŠ SMMK.4. Provision of material and technical equipment of the SMMK School.Information on measurable ukazovateľoch:Vzhľadom to focus the secondary schools, the premises and the educational process will meet all the requirements of inclusive education. 19 places for pre-primary education will be created in a modern fully accessible building, a revitalised outdoor area with attractive game features, 154 m² of building will be renovated and the annual primary energy consumption reduced by 27655 kWh per year, estimated annual greenhouse gas emission reduction of 5.63 t. (English)
    15 September 2021
    0 references

    Identifiers

    302021H846
    0 references