Reduction of energy intensity at KC MULTIPLAST, s.r.o. (Q3104045): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Žilina Region / rank
 
Normal rank

Revision as of 16:09, 15 September 2021

Project Q3104045 in Slovakia
Language Label Description Also known as
English
Reduction of energy intensity at KC MULTIPLAST, s.r.o.
Project Q3104045 in Slovakia

    Statements

    0 references
    44,819.05 Euro
    0 references
    52,728.29 Euro
    0 references
    0.85 percent
    0 references
    1 July 2018
    0 references
    1 August 2021
    0 references
    KC MULTIPLAST, s. r. o.
    0 references

    49°12'23.87"N, 18°46'19.88"E
    0 references
    Predkladaný projekt v zmysle Operačného programu Kvalita životného prostredia, výzvy číslo OPKZP-PO4-SC421-2017-30, je v celom rozsahu zameraný na investície súvisiace so zvýšením energetickej účinnosti podniku žiadateža realizáciou Opatrenia č.1- rekonštrukcia a modernizácia existujúcich energetických zariadení. Návrh opatrení na významnú, alebo hĺbkovú obnovu budovy a významnú obnovu technického zariadenia budovy pre zníženie jej energetickej náročnosti a zníženie emisií skleníkových plynov a znečisujúcich látok do ovzdušia bude realizovaný na adreseKC MULTIPLAST, s. r. o. - Pri Rajčianke č.24, Žilina. Budova sa nachádza na parcele  č. 3876/2. Výrobná hala je v prevádzke a je napojená na všetky potrebné inžinierske siete. Strategickým ciežom projektu je zníženie energetickej náročnosti v podniku KC MULTIPLAST, s. r. o. Špecifickými ciežmi projektu sú: zníženie tepelných strát,zníženie nákladov na vykurovanie,úspora energie,zníženie environmentálneho zaaženia,zabezpečenie vhodnej teploty pracovného prostredia,modernizácia podniku. Hlavnými aktivitami projektu sú:Zabezpečenie energetických auditov v MSPImplementácia opatrení z energetických auditov             Hlavná aktivita A spočíva v zabezpečení energetického auditu podniku. Aktivita B spočíva v implementácií zvoleného opatrenia z energetického auditu, konkrétne ide o zlepšenie tepelno-technických vlastností výrobnej budovy prostredníctvom zateplenia obvodových stien a výmeny okien a dverí v transparentných otvoroch spolu s transformáciou distribúcie tepla pre systém vykurovania. Realizáciou uvedených hlavných aktivít sa dosiahnu stanovené meratežné ukazovatele.             Hlavným výstupom projektu bude zlepšenie tepelnotechnických vlastností obvodových stien, stropov a výplni vonkajších otvorov, tým aj zlepšenie energetickej hospodárnosti a zníženie energetickej náročnosti budovy. Spolu s transformáciou distribúcie tepla pre systém vykurovania je význačným lokálnym environmentálnym prínosom. Zníženie potreby energie prinesie úsporu finančných prostriedkov, ktoré budú prínosom pre žiadateža (Slovak)
    0 references
    The submitted project in accordance with the Operational Programme Quality of the Environment, calls number OPKZP-PO4-SC421-2017-30, is entirely focused on investments related to the improvement of the energy efficiency of the company and the implementation of Measure No.1-contrusion and modernisation of existing energy equipment. The proposal for measures for significant or deep renovation of the building and significant renovation of the building’s technical equipment to reduce its energy intensity and reduce emissions of greenhouse gases and pollutants into the air will be implemented at the addressKC MULTIPLAST, s. r. o. – Pri Rajčianka No.24, ilina. The building is located on plot No. 3876/2. The production hall is in operation and is connected to all necessary ininiers networks. The strategic objective of the project is to reduce energy intensity at KC MULTIPLAST, s. r. o. specific objectives of the project are: reducing heat loss,reducing heating costs,saving energy,reducing environmental performance, ensuring a suitable working environment temperature, modernising the plant. Main activities of the project sú:Zabezpečenie energy audits in SMEsImplementation of measures from energy audits Main activity A consists of providing an energy audit of the company. Activity B consists of implementing the chosen measure from the energy audit, namely improving the thermal properties of the production building through insulation of perimeter walls and replacing windows and doors in transparent openings, together with the transformation of heat distribution for the heating system. The implementation of the above-mentioned main activities will achieve measured indicators.             The main output of the project will be to improve the thermal properties of perimeter walls, ceilings and filling of external openings, thereby improving the energy performance and reducing the energy intensity of the building. Together with the transformation of heat distribution for the heating system, it is a significant local environmental benefit. Reducing energy needs will save money that will benefit the applicant (English)
    15 September 2021
    0 references

    Identifiers

    310041T384
    0 references