Water protection measures in the municipality of Močenok (Q3104226): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Nitra Region / rank | |||
Normal rank |
Revision as of 15:48, 15 September 2021
Project Q3104226 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Water protection measures in the municipality of Močenok |
Project Q3104226 in Slovakia |
Statements
126,878.35 Euro
0 references
149,268.65 Euro
0 references
0.85 percent
0 references
1 September 2020
0 references
1 February 2021
0 references
Obec Močenok
0 references
Miestom realizácie projektu je obec Močenok v okrese aža. Bude sa jedna o výstavbu vodozádrných opatrení v obci Močenok za účelom zadrania daďovej vody vsakovaním alebo retenciou v navrhovanom území a teda zníeniu celkového mnostva vody pritekajúcej do verejnej daďovej kanalizácie pri prívalových daďoch s vplyvom na zníenie priebehu povodňovej vlny na napojených tokoch. Dotknutá parcela sa nachádza v centrálnej časti obce s prístupom z miestnej asfaltovej cesty. Na dotknutej parcele sa nachádza objekt Kultúrneho domu obkolesený trávnatými a lesnými porastami.V rámci projektu dôjde k realizácií nasledovných opatrení: Odvodnenie plochej strechy KD Tento stavebný objekt riei návrh odvodnenia daďovej vody plochej strechy objektu Kultúrneho domu, v súčasnosti je daďová voda zvedená cez atikový žab a tri fasádne zvody na junej strane objektu do podzemnej kanalizačnej siete.V rámci tohto objektu je navrhovaná kombinácia niie uvedených opatrení pre retenciu daďovej vody:SO 01.1 Zelená strecha KD 540,95 m2SO 01.2 Bioretenčné daďové jazero 30 m2SO 01.3 Potrubie PVC DN 160 Bezpečnostný prepad z jazera do vsaku 1mSO 01.4 Potrubie drenáne DN 160 Odvedenie vody zo strechy KD do jazera 18 mSO 01.5 Potrubie drenáne DN 160 Odvedenie vody zo strechy KD do jazera 11 mSO 01.6 Potrubie drenáne DN 160 Odvedenie vody zo strechy KD do jazera 18 mNavrhovaná odvodňovaná plocha objektu SO 01: 540,95+30= 570,95 m2Vybudovaním zelenej strechy dôjde k zadraniu daďovej vody vsakovaním na streche KD recyklovanými geotextíliami za podpory záhradného substrátu a navrhovaných rastlín.Voda, ktorú nestihne zelená strecha zadra bude zvedená cez atikový žab do troch fasádnych daďových zvodov, ktoré budú vedené pod zemou s vyústením do navrhovaného retenčného jazera, kde bude voda pri prívalových daďoch ďalej vsakova do podloia. Celý tento návrh počíta aj s bezpečnostným prepadom (v prípade dlhie trvajúcich daďoch) z retenčného jazera do vsakovacej ryhy dĺky 10 m.Odvodnenie východnej ikmej strechy KDTento stavebný objekt riei návrh odvodnenia daďovej vody zo ikmej časti strechy objektu Kultúrneho domu n a východnej strane. V súčasnosti je daďová voda zvedená cez odkvapový žab a jeden zvod na východnej strane objektu na asfaltový chodník, odkiaž odteká do prižahlej trávnatej plochy.V rámci tohto objektu je navrhovaná kombinácia niie uvedených opatrení pre retenciu a vsakovanie daďovej vody t tejto časti strechy:SO 02.1 Potrubie PVC DN 160 Odvedenie vody zo strechy KD do záhrady 10 mSO 02.2 Bioretenčná daďová záhrada 6m2SO 02.3 Potrubie PVC DN 160 Bezpečnostný prepad zo záhrady do vsaku 1mSO 02.4 Potrubie drenáne DN 160 na vsakovanie 10 mNavrhovaná odvodňovaná plocha objekt SO 01: 22,1 + 6 = 28,1 m2.Úpravou ukončenia daďového zvodu dôjde k zadraniu daďovej vody vsakovaním priamo v blízkosti KD za podpory záhradného substrátu a navrhovaných rastlín v daďovej záhrade.Voda, ktorú nestihne retenčná záhrada zadra, bude zvedená bezpečnostným prepadom (v prípade dlhie trvajúcich daďov) z retenčnej záhrady do vsakovacej ryhy dĺky 5m.Súčasou tohto stavebného objektu je aj oprava strenej krytiny KD, ktorá je v technicky nevyhovujúcom stave a pre zadranie vetkej daďovej vody dopadnutej na krytinu je potrebná výmena existujúcej krytiny a latovania, vrátane výmeny daďového žabu a zvodu.Odvodnenie plochej strechy prístavby KD a chodníkaTento stavebný objekt riei návrh odvodnenia daďovej vody z plochej časti strechy prístavby objektu Kultúrneho domu na severnej strane. V súčasnosti daďová voda je zvedená cez atikový žab a jeden zvod na severnej strane objektu na asfaltový chodník, odkiaž odteká do prižahlej trávnatej plochy.V rámci tohto objektu je navrhovaná kombinácia niie uvedených opatrení pre retenciu a vsakovanie daďovej vody z tejto časti strechy:SO 03.1 Potrubie PVC DN 160 Odvedenie vody zo strechy KD do nádre 11 mSO 03.2 Podzemná retenčná nádr 12 m3SO 03.3 Potrubie PVC DN 160 Bezpečnostný prepad z nádre do vsaku 1 mSO 03.4 Potrubie drenáne DN 160 na vsakovanie 10 mSO 03.5 Potrubie PVC DN 160 Odvedenie vody z drenáe do nádre 10 mSO 03.6 Potrubie drenáne DN 160 na vsakovanie z chodníka 56 mNavrhovaná odvodňovaná plocha objektu SO 01: 21,2 + 178,4+33,6=232,2m2Vybudovaním zelenej strechy dôjde k zadraniu daďovej vody vsakovaním priamo na streche KD recyklovaním geotextíliami za podpory záhradného substrátu a navrhovaných rastlín.Voda, ktorú nestihne zelená strecha zadra bude zvedená cez atikový žab do fasádneho daďového zvodu, ktorý bude následne vedený pod zemou s vyústením do navrhovanej retenčnej nádre, kde sa (Slovak)
0 references
The place of implementation of the project is the municipality of Močenok in the district of upa. It will be the construction of water-surface measures in the municipality of Močenok in order to curb the water by infiltration or retention in the proposed area and thus to reduce the total amount of water flowing into the public rain sewer at torrential rains with the effect of reducing the course of the flood wave on the connected flows. The parcel concerned is located in the central part of the municipality with access from the local asphalt road. On the affected plot there is a building of the Cultural House surrounded by grassy and forest cover.The project will implement the following measures: Drainage of the flat roof KD This building building is designed to drain the water of the flat roof of the building of the Cultural House, currently the water is drained through an atic frog and three facade leads on the south side of the building to the underground sewer network.The combination of the above mentioned measures for the retention of water:SO 01.1 Green roof KD 540 is proposed within this building. 95 m2SO 01.2 Bioretention dam lake 30 m2SO 01.3 PVC pipe DN 160 Safety overflow from lake to bag 1mSO 01.4 DN drainage pipe DN 160 Driving water from the roof KD to lake 18 MSO 01.5 Pipe drainage DN 160 Drainage water from the roof of KD to lake 11 MSO 01.6 Pipeline drainage DN 160 Driving water from the roof of KD to lake 18 mProposed drainage area of building SO 01: 540.95+ 30= 570.95 m2Building of the green roof will result in the drainage of water by soaking on the roof of KD recycled geotextiles with the support of the garden substrate and the proposed plants.Water that does not reach the green roof of Zadra will be drained through an attic frog to three facade daivods, which will be led below the ground with a result in the proposed retention lake, where the water will be further into the subfloor in the torrential daiden. The whole proposal also foresees a safety overflow (in the case of long lasting dates) from the retention lake to the inlet groove of 10 m.The drainage of the eastern ikm roof KDThis building building is the proposal to drain the water from the ikmated part of the roof of the building of the Cultural House n and the east side. Currently, the water is drained through the gutter frog and one downpipe on the east side of the building on the asphalt path, from where it flows into the amazing grassy area.In this building, a combination of the above mentioned measures for retention and insulation of dam water t of this part of the roof is proposed:SO 02.1 Pipeline PVC DN 160 Driving water from the roof KD to the garden 10 MSO 02.2 Bioretention rain garden 6m2SO 02.3 PVC DN pipe 160 Safety overflow from garden to bag 1mSO 02.4 DN 160 drainage pipeline for infiltration 10 mProposed drainage area Object SO 01: 22,1 + 6 = 28,1 m².The correction of the end of the rainwater will result in the supply of water by soaking in the vicinity of the KD with the support of the garden substrate and the proposed plants in the garden.Water, which does not reach the Zadra retention garden, will be carried out by safety overflow (in the case of long lasting rains) from the retention garden to the insertion line of the length of 5 m.The time of this building is also the repair of the strung covering KD, which is in a technically unsatisfactory condition and in order to seal all the rainwater impacted on the roofing, it is necessary to replace the existing covering and lathing, including the replacement of the dadzové frog and the downhill.The drainage of the flat roof of the extension KD and the pavementThis building building riei the proposal to drain the water from the flat part of the roof of the building of the Cultural House on the north side. Currently, the water is drained through an attic frog and one downpipe on the north side of the building on the asphalt path, from where it flows into the beautiful grassy area.In this building, a combination of the above mentioned measures for retention and insulation of dam water from this part of the roof is proposed:SO 03.1 Pipe PVC DN 160 Drinking water from the roof KD to the wall 11 MSO 03.2 Underground retention dash 12 m3SO 03.3 PVC DN pipe 160 Safety overflow from gypsum to bag 1 MSO 03.4 DN 160 drainage pipeline for injection 10 MSO 03.5 Pipe PVC DN 160 Driving water from drainage to aperture 10 MSO 03.6 DN 160 pipeline for insulation from the pavement 56 mProposed drainage area SO 01: 21,2 + 178,4+ 33,6=232,2m2Building a green roof, the water will become sealed by soaking directly on the roof of KD by recycling geotextiles with the support of the garden substrate and the proposed plants.Water that does not reach the green roof of Zadra will be drained through an attic frog to the facade dame downhill, which will then be led below the ground with the result in the proposed retention wall, where (English)
15 September 2021
0 references
Identifiers
310021S489
0 references