Construction of Lugoj highway – Deva lot 2, lot 3 and lot 4 (Dumbrava – Deva sector) – FAZA 2 (Q3095616): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
46°26'8.38"N, 23°46'21.25"E
| |||||||||||
Property / coordinate location: 46°26'8.38"N, 23°46'21.25"E / rank | |||||||||||
Normal rank |
Revision as of 15:12, 15 September 2021
Project Q3095616 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of Lugoj highway – Deva lot 2, lot 3 and lot 4 (Dumbrava – Deva sector) – FAZA 2 |
Project Q3095616 in Romania |
Statements
1,540,691,235.0 Romanian Leu
0 references
1,812,577,924.0 Romanian Leu
0 references
0.85 percent
0 references
1 January 2014
0 references
1 March 2021
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
The main socio-economic objectives of the projects are: - To improve the traffic efficiency through reduction of the travel time; - To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); - To improve traffic safety; - To reduce environmental impact; - To improve accessibility. After both phases are going to be finalized, the project as an overrole will accomplish the general objectives of the program - Priority Axis 1 - Improving mobility by developing the TEN-T network and subway. (Romanian)
0 references
The main socio-economic objectives of the projects are: — To improve the traffic efficiency through reduction of the travel time; — To improve transport efficiency through reduction of operation and maintenance costs (both for users and infrastructure operator); — To improve traffic safety; — To reduce environmental impact; — To improve accessibility. After both phases are going to be Finalised, the project as an overrole will accomplish the general objectives of the program – Priority Axis 1 – Improving mobility by developing the TEN-T network and subway. (English)
14 September 2021
0 references
Dumbrava, Romania
0 references
Municipiul Deva, Romania
0 references
Identifiers
110562
0 references