Completion of the Residual Water Drainage Subsystem of Mezio Alguidar (Q2982273): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 15:08, 15 September 2021
Project Q2982273 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Completion of the Residual Water Drainage Subsystem of Mezio Alguidar |
Project Q2982273 in Portugal |
Statements
779,237.44 Euro
0 references
10 August 2016
0 references
30 September 2020
0 references
MUNICÍPIO DE LOUSADA
0 references
Q3000056 (Deleted Item)
0 references
A presente operação contempla a instalação das redes em baixa necessárias para concluir o Subsistema do Mezio, bem como o estudo geológico e o levantamento topográfico necessários para o respetivo projeto. Prevê-se também a instalação dos Intercetores em alta que permitem fechar este subsistema. (Portuguese)
0 references
The present operation includes the installation of the low-level networks necessary to complete the Mezio Subsystem, as well as the geological study and topographic survey necessary for the respective project. It is also planned to install the high Interceptors to close this subsystem. (English)
9 July 2021
0 references
Lousada
0 references
Identifiers
POSEUR-03-2012-FC-000380
0 references