Works at Carrascal Water Treatment Station (Q2982580): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 15:03, 15 September 2021
Project Q2982580 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Works at Carrascal Water Treatment Station |
Project Q2982580 in Portugal |
Statements
73,300.86 Euro
0 references
1 March 2018
0 references
29 December 2019
0 references
MUNICÍPIO DE VILA DE REI
0 references
Q2991038 (Deleted Item)
0 references
A operação visa a reabilitação de uma ETAR, no sentido de maximizar o cumprimento dos normativos, assegurando maior intervenção no âmbito da proteção do ambiente, especialmente ao nível das massas de água e, contribuir para a otimização dos recursos e infraestruturas existentes, garantindo a qualidade do serviço prestado às populações e a sustentabilidade dos sistemas de tratamento de águas urbanas. (Portuguese)
0 references
The operation aims at the rehabilitation of a sewage treatment plant, in order to maximise compliance with the regulations, ensuring greater intervention in the field of environmental protection, especially at the level of water bodies, and contributing to the optimisation of existing resources and infrastructure, ensuring the quality of the service provided to the population and the sustainability of urban water treatment systems. (English)
9 July 2021
0 references
Vila de Rei, Vila de Rei
0 references
Identifiers
POSEUR-03-2012-FC-000830
0 references