Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems (Q2982854): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:52, 15 September 2021

Project Q2982854 in Portugal
Language Label Description Also known as
English
Installation and Benefit of Equipment for Water and Energy Efficiency in Low Systems, with a view to the Control and Reduction of Loss in the Water Distribution and Aduction Systems
Project Q2982854 in Portugal

    Statements

    0 references
    198,374.24 Euro
    0 references
    1 January 2020
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE POMBAL
    0 references
    Q2990897 (Deleted Item)
    0 references
    0 references

    39°54'58.28"N, 8°37'40.51"W
    0 references
    A candidatura consiste na criação de 70 ZMC's nos 1.390 Km de rede e instalação de 70 medidores de caudal, de 147 válvulas de seccionamento e de 5 sistemas redutores de pressão, nas infraestruturas de AA já existente instalação de equipamento informático de gestão de redes e comunicação, visando a redução de perdas reais de água, que se estimam em 10% após a conclusão da empreitada a levar a efeito no âmbito desta candidatura. (Portuguese)
    0 references
    The application consists of the creation of 70 ZMC’s in the 1.390 Km network and the installation of 70 flow meters, 147 sectioning valves and 5 pressure-reducing systems in the existing AA infrastructure installation of computer equipment for network and communication management, aiming at reducing real water losses, which are estimated to be 10 % after the completion of the contract to be carried out under this application. (English)
    9 July 2021
    0 references
    Pombal
    0 references

    Identifiers

    POSEUR-03-2012-FC-001297
    0 references