INTERVENTION WORKS IN ORDER TO INCREASE ENERGY PERFORMANCE AT THE “BISHOP NICOLAE POPOVICI” MUNICIPAL HOSPITAL THE BUILDINGS WITH NO. FALL. 103486-C1 AND NO. 103486-C14 (Q2745463): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Tag: Replaced
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / country
 
Property / country: Romania / rank
Normal rank
 
Property / EU contribution
10,699,099.2 Romanian Leu
Amount10,699,099.2 Romanian Leu
UnitRomanian Leu
 
Property / EU contribution: 10,699,099.2 Romanian Leu / rank
Normal rank
 
Property / EU contribution
2,139,819.84 Euro
Amount2,139,819.84 Euro
UnitEuro
 
Property / EU contribution: 2,139,819.84 Euro / rank
Preferred rank
 
Property / EU contribution: 2,139,819.84 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / EU contribution: 2,139,819.84 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
12,587,175.52 Romanian Leu
Amount12,587,175.52 Romanian Leu
UnitRomanian Leu
 
Property / budget: 12,587,175.52 Romanian Leu / rank
Normal rank
 
Property / budget
2,517,435.1040000003 Euro
Amount2,517,435.1040000003 Euro
UnitEuro
 
Property / budget: 2,517,435.1040000003 Euro / rank
Preferred rank
 
Property / budget: 2,517,435.1040000003 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / budget: 2,517,435.1040000003 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 
Property / start time
11 September 2017
Timestamp+2017-09-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 11 September 2017 / rank
Normal rank
 
Property / end time
31 August 2021
Timestamp+2021-08-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 August 2021 / rank
Normal rank
 
Property / beneficiary name (string)
MUNICIPIUL BEIUS
 
Property / beneficiary name (string): MUNICIPIUL BEIUS / rank
Normal rank
 
Property / location (string)
BIHOR, Beius
 
Property / location (string): BIHOR, Beius / rank
Normal rank
 
Property / summary
Prin prezentul proiect de crestere a eficientei energetice se propune implementarea unor masuri de eficientizare energetica si folosirea energiilor regenerabile ( pentru producerea energiei electrice necesare pentru iluminat, climatizare si apa calda menajera ) ceea ce va duce la o folosire optimizata a resurselor energetice locale pentru incalzire, apa calda menajera, ventilatie si iluminare cu efecte durabile de protejare a meiului inconjurator (Romanian)
 
Property / summary: Prin prezentul proiect de crestere a eficientei energetice se propune implementarea unor masuri de eficientizare energetica si folosirea energiilor regenerabile ( pentru producerea energiei electrice necesare pentru iluminat, climatizare si apa calda menajera ) ceea ce va duce la o folosire optimizata a resurselor energetice locale pentru incalzire, apa calda menajera, ventilatie si iluminare cu efecte durabile de protejare a meiului inconjurator (Romanian) / rank
Normal rank
 
Property / summary
Through this project to increase energy efficiency, we propose the implementation of energy efficiency measures and the use of renewable energies (to produce electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding mill (English)
 
Property / summary: Through this project to increase energy efficiency, we propose the implementation of energy efficiency measures and the use of renewable energies (to produce electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding mill (English) / rank
Normal rank
 
Property / summary: Through this project to increase energy efficiency, we propose the implementation of energy efficiency measures and the use of renewable energies (to produce electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding mill (English) / qualifier
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / coordinate location
46°40'44.22"N, 22°20'47.26"E
Latitude46.6789466
Longitude22.346464509504
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 46°40'44.22"N, 22°20'47.26"E / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Bihor / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q2756617 / rank
Normal rank
 

Revision as of 12:55, 14 September 2021

Project Q2745463 in Romania
Language Label Description Also known as
English
INTERVENTION WORKS IN ORDER TO INCREASE ENERGY PERFORMANCE AT THE “BISHOP NICOLAE POPOVICI” MUNICIPAL HOSPITAL THE BUILDINGS WITH NO. FALL. 103486-C1 AND NO. 103486-C14
Project Q2745463 in Romania

    Statements

    Identifiers

    118548
    0 references