Energy efficiency works at Orastie Municipal Hospital (Q2744892): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Tag: Replaced
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / intervention field
 
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank
Normal rank
 
Property / country
 
Property / country: Romania / rank
Normal rank
 
Property / EU contribution
10,910,973.6685 Romanian Leu
Amount10,910,973.6685 Romanian Leu
UnitRomanian Leu
 
Property / EU contribution: 10,910,973.6685 Romanian Leu / rank
Normal rank
 
Property / EU contribution
2,182,194.7337 Euro
Amount2,182,194.7337 Euro
UnitEuro
 
Property / EU contribution: 2,182,194.7337 Euro / rank
Preferred rank
 
Property / EU contribution: 2,182,194.7337 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / EU contribution: 2,182,194.7337 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
12,836,439.610000001 Romanian Leu
Amount12,836,439.610000001 Romanian Leu
UnitRomanian Leu
 
Property / budget: 12,836,439.610000001 Romanian Leu / rank
Normal rank
 
Property / budget
2,567,287.9220000003 Euro
Amount2,567,287.9220000003 Euro
UnitEuro
 
Property / budget: 2,567,287.9220000003 Euro / rank
Preferred rank
 
Property / budget: 2,567,287.9220000003 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / budget: 2,567,287.9220000003 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 
Property / start time
13 June 2018
Timestamp+2018-06-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 13 June 2018 / rank
Normal rank
 
Property / end time
31 May 2021
Timestamp+2021-05-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 May 2021 / rank
Normal rank
 
Property / beneficiary name (string)
SPITALUL MUNICIPAL ORASTIE
 
Property / beneficiary name (string): SPITALUL MUNICIPAL ORASTIE / rank
Normal rank
 
Property / location (string)
Hunedoara, Orăștie
 
Property / location (string): Hunedoara, Orăștie / rank
Normal rank
 
Property / summary
Lucrari specifice aplicate izolatiei termice a anvelopei cladirilor spitalului (pereti exteriori, ferestre, tamplarie, planseu peste ultimul nivel planseu peste subsol, etc), a sarpantelor si invelitorilor inclusiv lucrari de finisaje, prin instalarea unui sistem de ventilare mecanica modern cu recuperarea energiei, prin inlocuirea instalatiilor pentru prepararea, distributia si utilizarea agentului termic pentru incalzire si pentru apa calda, instalarea de robineti monobloc cu senzor, inlocuirea corpurilor de iluminat fluorescent cu corpuri de iluminat cu eficienta energetica ridicata si durata mare de viata - corpuri de tip LED, respectiv prin inlocuirea a 3 lifturi mari consumatoare de energie cu altele noi, menite sa reduca pierderile de energie electrica. (Romanian)
 
Property / summary: Lucrari specifice aplicate izolatiei termice a anvelopei cladirilor spitalului (pereti exteriori, ferestre, tamplarie, planseu peste ultimul nivel planseu peste subsol, etc), a sarpantelor si invelitorilor inclusiv lucrari de finisaje, prin instalarea unui sistem de ventilare mecanica modern cu recuperarea energiei, prin inlocuirea instalatiilor pentru prepararea, distributia si utilizarea agentului termic pentru incalzire si pentru apa calda, instalarea de robineti monobloc cu senzor, inlocuirea corpurilor de iluminat fluorescent cu corpuri de iluminat cu eficienta energetica ridicata si durata mare de viata - corpuri de tip LED, respectiv prin inlocuirea a 3 lifturi mari consumatoare de energie cu altele noi, menite sa reduca pierderile de energie electrica. (Romanian) / rank
Normal rank
 
Property / summary
Specific works applied to the thermal insulation of the hospital building envelopes (outdoor walls, windows, carpentry, floor above the last floor floor over the basement, etc.), of sarpents and wrappers including finishing works, by installing a modern mechanical ventilation system with energy recovery, by replacing the installations for preparing, distributing and using the heating agent for heating and hot water, installing high energy valves with high energy consumption, changing the life of the fluorescent bodies. (English)
 
Property / summary: Specific works applied to the thermal insulation of the hospital building envelopes (outdoor walls, windows, carpentry, floor above the last floor floor over the basement, etc.), of sarpents and wrappers including finishing works, by installing a modern mechanical ventilation system with energy recovery, by replacing the installations for preparing, distributing and using the heating agent for heating and hot water, installing high energy valves with high energy consumption, changing the life of the fluorescent bodies. (English) / rank
Normal rank
 
Property / summary: Specific works applied to the thermal insulation of the hospital building envelopes (outdoor walls, windows, carpentry, floor above the last floor floor over the basement, etc.), of sarpents and wrappers including finishing works, by installing a modern mechanical ventilation system with energy recovery, by replacing the installations for preparing, distributing and using the heating agent for heating and hot water, installing high energy valves with high energy consumption, changing the life of the fluorescent bodies. (English) / qualifier
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / coordinate location
45°50'12.34"N, 23°11'45.06"E
Latitude45.8367637
Longitude23.1958453
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 45°50'12.34"N, 23°11'45.06"E / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Hunedoara / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q2755380 / rank
Normal rank
 

Revision as of 12:22, 14 September 2021

Project Q2744892 in Romania
Language Label Description Also known as
English
Energy efficiency works at Orastie Municipal Hospital
Project Q2744892 in Romania

    Statements

    Identifiers

    115658
    0 references