Basic School of Foz do Neiva, Castelo do Neiva, Viana do Castelo Fibrocimento Removal (Q2899506): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters., translated_summary)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:45, 13 September 2021

Project Q2899506 in Portugal
Language Label Description Also known as
English
Basic School of Foz do Neiva, Castelo do Neiva, Viana do Castelo Fibrocimento Removal
Project Q2899506 in Portugal

    Statements

    0 references
    113,602.5 Euro
    0 references
    2 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE VIANA DO CASTELO
    0 references
    Q3000045 (Deleted Item)
    0 references

    41°52'49.19"N, 8°31'23.74"W
    0 references
    Remoção de fibrocimento no edifício escolar. Os trabalhos a realizar abarcam a remoção integral da cobertura de amianto no edifício escolar, conforme normas de controlo e qualidade ambiental com a posterior colocação de uma cobertura dotada de isolamento térmico e providas de caleiras. (Portuguese)
    0 references
    Fibrocement removal in the school building. The work to be carried out covers the complete removal of the asbestos cover from the school building, according to environmental control and quality standards, with the subsequent placement of a thermal insulation roof and with gutters. (English)
    8 July 2021
    0 references
    Viana do Castelo
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000366
    0 references