Axis I – Promotion of Suaves Mobility Modes |Requalification of Structural Pedonal Axes|pedu – PMUS – Vila Real (Q2895552): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): It is organised into 3 actions, with the following interventions: AC 1 – Requalification of EPE | City Center-UTAD-Centro Comercial Ac.2 – Requalification of EPE | City Center-Central Hospital Link and Ac. 3 – Requalification of EPE | Link Center of the City-North of the City (RI13).The work aims to provide these areas with more urban characteristics, aimed at the implementation of solutions of soft mobility, pedestrian mobility and the cyclable...)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 13:50, 13 September 2021

Project Q2895552 in Portugal
Language Label Description Also known as
English
Axis I – Promotion of Suaves Mobility Modes |Requalification of Structural Pedonal Axes|pedu – PMUS – Vila Real
Project Q2895552 in Portugal

    Statements

    0 references
    950,307.85 Euro
    0 references
    17 November 2017
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE VILA REAL
    0 references
    Q3001009 (Deleted Item)
    0 references

    41°31'22.33"N, 7°32'47.51"W
    0 references
    Está organizada em 3 ações, com as intervenções: Ac 1 - Requalificação dos EPE | Centro da Cidade-UTAD-Centro Comercial Ac.2 - Requalificação dos EPE | Ligação Centro da Cidade-Hospital Central e Ac. 3 - Requalificação dos EPE | Ligação Centro da Cidade-Norte da Cidade (RI13).Os trabalhos pretendem dotar estas zonas de características mais urbanas, que visem a implementação de soluções de mobilidade suave, mobilidade pedonal e a ciclável. (Portuguese)
    0 references
    It is organised into 3 actions, with the following interventions: AC 1 – Requalification of EPE | City Center-UTAD-Centro Comercial Ac.2 – Requalification of EPE | City Center-Central Hospital Link and Ac. 3 – Requalification of EPE | Link Center of the City-North of the City (RI13).The work aims to provide these areas with more urban characteristics, aimed at the implementation of solutions of soft mobility, pedestrian mobility and the cyclable. (English)
    8 July 2021
    0 references
    Vila Real
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000270
    0 references