Requalification of the Orlando Ribeiro Municipal Library (Q2880635): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 50.0 percent / rank | |||||||
Revision as of 12:12, 13 September 2021
Project Q2880635 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the Orlando Ribeiro Municipal Library |
Project Q2880635 in Portugal |
Statements
76,619.32 Euro
0 references
1 July 2020
0 references
31 December 2022
0 references
MUNICIPIO DE LISBOA
0 references
As medidas de eficiência energética incluem a otimização do desempenho térmico da cobertura e dos vãos envidraçados, intervenção no sistema de iluminação, substituição das UTAN e das bombas de calor, e instalação de sistema solar fotovoltaico. A redução global do consumo da energia é de 45,4%, A redução global das emissões de CO2 é de 45,4%. A classe de eficiência energética do edifício antes de intervenção é o C e após intervenção será o B. (Portuguese)
0 references
Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English)
7 July 2021
0 references
Lisboa, Lumiar
0 references
Identifiers
LISBOA-03-1203-FEDER-000109
0 references