Arrival and Confluence Stops – Phase 2 – Bus Terminal (Q2878160): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 11:37, 13 September 2021

Project Q2878160 in Portugal
Language Label Description Also known as
English
Arrival and Confluence Stops – Phase 2 – Bus Terminal
Project Q2878160 in Portugal

    Statements

    0 references
    637,955.82 Euro
    0 references
    30 July 2018
    0 references
    15 May 2022
    0 references
    MUNICIPIO DE TORRES VEDRAS
    0 references
    0 references
    A operação visa a construção de uma cobertura de proteção dos cais de embarque do Terminal Rodoviário de Torres Vedras. A melhoria da interface principal de transportes públicos pretende melhorar as condições de oferta do serviço, induzindo o aumento da sua utilização, alinhando-se com as estratégias nacionais e europeias de redução dos GEE. (Portuguese)
    0 references
    The operation aims at the construction of a protective cover of the boarding docks of the Torres Vedras Bus Terminal. The improvement of the main public transport interface is intended to improve the conditions of service provision by increasing its use, aligning itself with national and European GHG reduction strategies. (English)
    7 July 2021
    0 references
    Torres Vedras, União das freguesias de Torres Vedras (São Pedro, Santiago, Santa Maria do Castelo e São Miguel) e Matacães
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000034
    0 references