St. Teotónio’s School Center (Q2862675): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 09:23, 13 September 2021
Project Q2862675 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | St. Teotónio’s School Center |
Project Q2862675 in Portugal |
Statements
1,109,991.83 Euro
0 references
16 April 2018
0 references
30 November 2020
0 references
MUNICÍPIO DE ODEMIRA
0 references
O projeto prevê a construção de 8 salas de aulas, 3 salas polivalentes, biblioteca e diversas instalações de apoio ao funcionamento do equipamento assim como zonas de jogo no exterior e um alpendre coberto, situa-se à cota mais alta do recinto onde se encontra instalada a EB 2,3, paredes meias com o pavilhão desportivo e desenvolve-se em 2 pisos, sendo só visível o piso superior a partir da rua confinante a norte, por onde se fará o acesso. (Portuguese)
0 references
The project provides for the construction of 8 classrooms, 3 multipurpose rooms, library and various facilities to support the operation of the equipment as well as play areas outside and a covered porch, is located at the highest level of the enclosure where EB 2.3 is installed, sock walls with the sports pavilion and develops on 2 floors, with only the upper floor visible from the street bordering north, through which access will be made. (English)
6 July 2021
0 references
Odemira, São Teotónio
0 references
Identifiers
ALT20-02-5673-FEDER-000008
0 references