St. Teotónio’s School Center (Q2862675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 09:23, 13 September 2021

Project Q2862675 in Portugal
Language Label Description Also known as
English
St. Teotónio’s School Center
Project Q2862675 in Portugal

    Statements

    0 references
    1,109,991.83 Euro
    0 references
    16 April 2018
    0 references
    30 November 2020
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references

    37°30'10.48"N, 8°41'5.39"W
    0 references
    O projeto prevê a construção de 8 salas de aulas, 3 salas polivalentes, biblioteca e diversas instalações de apoio ao funcionamento do equipamento assim como zonas de jogo no exterior e um alpendre coberto, situa-se à cota mais alta do recinto onde se encontra instalada a EB 2,3, paredes meias com o pavilhão desportivo e desenvolve-se em 2 pisos, sendo só visível o piso superior a partir da rua confinante a norte, por onde se fará o acesso. (Portuguese)
    0 references
    The project provides for the construction of 8 classrooms, 3 multipurpose rooms, library and various facilities to support the operation of the equipment as well as play areas outside and a covered porch, is located at the highest level of the enclosure where EB 2.3 is installed, sock walls with the sports pavilion and develops on 2 floors, with only the upper floor visible from the street bordering north, through which access will be made. (English)
    6 July 2021
    0 references
    Odemira, São Teotónio
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000008
    0 references