Reconstruction of Līvāni Municipality building and improvement of energy efficiency – Stage 4 (Q3057197): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item)
Property / co-financing rate
 
0.85 percent
Amount0.85 percent
Unitpercent
Property / co-financing rate: 0.85 percent / rank
 
Normal rank

Revision as of 14:08, 10 September 2021

Project Q3057197 in Latvia
Language Label Description Also known as
English
Reconstruction of Līvāni Municipality building and improvement of energy efficiency – Stage 4
Project Q3057197 in Latvia

    Statements

    0 references
    0 references
    84,885.0 Euro
    0 references
    99,864.71 Euro
    0 references
    0.85 percent
    0 references
    9 June 2021
    0 references
    31 December 2022
    0 references
    LĪVĀNU NOVADA DOME
    0 references
    0 references

    56°21'18.58"N, 26°10'31.76"E
    0 references
    Projekta mērķis - veikt energoefektivitātes paaugstināšanas pasākumu kopumu Līvānu bērnu un jauniešu centra ēkā Rīgas ielā 4b, tādējādi veicinot oglekļa dioksīda emisiju un primārās enerģijas patēriņa samazināšanu, sekmējot dabas vides, cilvēka dzīves vides kvalitātes uzlabošanu Līvānu teritorijā.Projektā plānotās aktivitātes: 1) Ēkas Rīgas 4b, Līvānos energoefektivitātes uzlabošanas pasākumi:- ārsienu, logu un durvju aiļu siltināšana, - pamatu un cokola siltināšana, - savietotā jumta siltināšana, - rekuperatīvās ventilācijas sistēmas ar siltuma atguvi virs 85% ierīkošana,- atdalošā siltummaiņa, cirkulācijas sūkņa un automātikas uzstādīšana apkures sistēmā.2) Būvdarbu būvuzraudzība;3) Būvdarbu autoruzraudzība. Projekta realizācijas laiks: 20 mēnešiProjekta izmaksas:Kopējās izmaksas: 143 476,03 EUR, t.sk.:Attiecināmās izmaksas: 99 864,71 EUR, t.sk.:- ERAF - 84 885,00 EUR (85%)- Valsts budžeta dotācija - 4 493,91 EUR (4,50%)- Pašvaldības līdzfinansējums - 10 485,80 EUR (10,50%)Neattiecināmās (pašvaldības finansējums) - 43 611,32 EURProjektā sasniedzamās iznākuma rādītāju vērtības:- Primārās enerģijas gada patēriņa samazinājums sabiedriskajās ēkās projekta ietvaros veikto investīciju rezultātā 37 068 kWh/gadā- Siltumnīcefekta (ogļskābo) gāzu samazinājums gadā projekta ietvaros veikto investīciju rezultātā 9,890 tonnas CO2 ekvivalenta (Latvian)
    0 references
    The aim of the project was to carry out a set of energy efficiency improvement measures in the Livani Children and Youth Centre building at Riga Street 4b, thus contributing to the reduction of carbon dioxide emissions and primary energy consumption, contributing to the improvement of the quality of the natural environment and the environment of human life in Livani territory. 1) Building Riga 4b, Līvāni energy efficiency improvement measures:- Insulation of exterior walls, windows and doorways, – insulation of bases and caps, – insulation of the combined roof, – regenerative ventilation system with heat recovery above 85 % installation,- separating heat exchanger, circulation pump and automatics installation in the heating system.2) Construction supervision of construction works; 3) Automatic supervision of construction works. Project implementation time: 20 monthsProject costs:Total cost: EUR 143476,03 of which: The eligible costs: EUR 99864,71, of which:- ERDF – EUR 84885,00 (85 %)- State budget grant – EUR 4493,91 (4.50 %)- Municipal co-financing – EUR 10485,80 (10,50 %) ineligible (municipal financing) – EUR 43 611,32 Values of output indicators to be achieved in the project:- Reduction of annual primary energy consumption in public buildings as a result of investments made within the project of 37068 kWh/year- Reduction of thermal (carbonic) gas per year as a result of the project equivalent CO2 investments of 9 tonnes (English)
    15 July 2021
    0 references
    Rīgas iela 4B, Līvāni, Līvānu nov., LV-5316
    0 references

    Identifiers

    4.2.2.0/20/I/018
    0 references