Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33 (bridge) (Q3057645): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item) |
||||||
Property / co-financing rate | |||||||
0.85 percent
| |||||||
Property / co-financing rate: 0.85 percent / rank | |||||||
Normal rank |
Revision as of 14:02, 10 September 2021
Project Q3057645 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33 (bridge) |
Project Q3057645 in Latvia |
Statements
6,722,893.91 Euro
0 references
7,909,286.96 Euro
0 references
0.85 percent
0 references
28 June 2016
0 references
27 September 2019
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posma Krasti - Ērberģe km 29,20-40,33, Viesītes tilta, caurtekas un tuneļa pārbūves darbus, kas ietver segas izbūvi, būvuzraudzību, autoruzraudzību. Plānotais kopējais projekta īstenošanas ilgums 39 mēneši. Projekta plānotās kopējās izmaksas 9 046 063,18 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums – 7 689 153,70 euro un valsts budžeta finansējums – 1 356 909,48 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posma Krasti - Ērberģe km 29,20-40,33, ieskaitot Viesītes tiltu, tuneli un caurteku – 11,13 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
0 references
The aim of the project is the reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33, Viesīte bridge, culvert and tunnel reconstruction works, which include construction of a duvet, construction supervision, author supervision. The total planned duration of the project is 39 months. The planned total cost of the project is EUR 9046063,18, including the planned European Regional Development Fund funding – EUR 7689153.70 and the state budget funding – EUR 1356909.48. As a result of the project, the national regional road P73 Vecumnieki – Nereta – Subate section Krasti – Ērberģe km 29.20-40.33, including Viesīte bridge, tunnel and culvert – 11.13 km. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
15 July 2021
0 references
Mazzalves pag., Aizkraukles nov.
0 references
Mazzalves pag., Aizkraukles nov.
0 references
Identifiers
6.3.1.0/16/I/008
0 references